Difference between revisions of "Controls Meeting 25-Jan-2024"
From GlueXWiki
(Created page with "* Announcements * Solenoid status ** PXI code modifications (Brian,Hovanes,Beni) * ECAL chiller status (Scot, Bobby) * ECAL and FCAL sensor installations (Bobby) * Status o...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
* Status of the power for the ECAL racks (Tim, Scot) | * Status of the power for the ECAL racks (Tim, Scot) | ||
* ECAL and FCAL voltage controls (Hovanes) | * ECAL and FCAL voltage controls (Hovanes) | ||
− | * ECAL HV resets and interlocks (Bobby) | + | * ECAL HV crate resets and board interlocks (Bobby) |
* New NMR probe and chassis (Scot,Hovanes) | * New NMR probe and chassis (Scot,Hovanes) | ||
* Other items | * Other items | ||
Line 14: | Line 14: | ||
==Time/Location== | ==Time/Location== | ||
− | 10:00am Thursday 25-January- | + | 10:00am Thursday 25-January-2024 |
Latest revision as of 09:47, 23 April 2024
- Announcements
- Solenoid status
- PXI code modifications (Brian,Hovanes,Beni)
- ECAL chiller status (Scot, Bobby)
- ECAL and FCAL sensor installations (Bobby)
- Status of the power for the ECAL racks (Tim, Scot)
- ECAL and FCAL voltage controls (Hovanes)
- ECAL HV crate resets and board interlocks (Bobby)
- New NMR probe and chassis (Scot,Hovanes)
- Other items
Time/Location
10:00am Thursday 25-January-2024