Thursday January 18, 2024, 1pm | Thursday January 18, 2024, 1pm | ||
− | * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, | + | * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard |
− | + | ||
== Agenda == | == Agenda == | ||
− | + | Discuss changes being made as a result of the review last fall | |
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page | ** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page | ||
Line 15: | Line 14: | ||
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square | * Tungsten absorber changed from 15.2 cm square to 14.2 cm square | ||
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim) | * Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim) | ||
+ | ** Kapton is good for 6x10^9 RADS | ||
* Is there enough space for a profiler and active collimator? | * Is there enough space for a profiler and active collimator? | ||
** Assume current AC and new profiler | ** Assume current AC and new profiler |
Latest revision as of 13:47, 19 January 2024
Meeting Time and Place
Thursday January 18, 2024, 1pm
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard
Agenda
Discuss changes being made as a result of the review last fall
- link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
Minutes/Actions
- Tungsten absorber changed from 15.2 cm square to 14.2 cm square
- Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)
- Kapton is good for 6x10^9 RADS
- Is there enough space for a profiler and active collimator?
- Assume current AC and new profiler
- Bring AC and profiler 3D models into existing KPT model (Keith)
- Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)
- Need to address thermal fatigue of tungsten and beryllium by June (Tim)
- The review recommended an FMEA be performed for system failures such as cooling and power (Tim)
- Need to develop a plan for decommissioning and design but not procure the needed items (Tim)
- Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly
- Hall A had some experience with tungsten heating
- We need to make sure RADCON approves the current design (Hovanes)
- Need to reissue overall layout for review (Keith)