+ | ==Monday March 20== | ||
+ | ===Past 72 hours=== | ||
+ | |||
+ | ===Shift Summaries=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4150537 Friday day shift] | ||
+ | * [https://logbooks.jlab.org/entry/4150706 Friday swing shift] | ||
+ | * [https://logbooks.jlab.org/entry/4150816 Friday owl shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151420 Saturday early riser shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151513 Saturday day shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151609 Saturday swing shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151684 Saturday owl shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151756 Sunday early riser shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151847 Sunday day shift] | ||
+ | * [https://logbooks.jlab.org/entry/4151948 Sunday swing shift] | ||
+ | * [https://logbooks.jlab.org/entry/4152032 Sunday owl shift] | ||
+ | * [https://logbooks.jlab.org/entry/4152110 Monday early riser shift] | ||
+ | |||
+ | ===Reports=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4150942 omega yields at 900nA] -- Justin | ||
+ | * [https://logbooks.jlab.org/entry/4151580 TAGM bunch time structure] -- Hovanes | ||
+ | * [https://logbooks.jlab.org/entry/4151946 occasional rapid access for tending PS test setup] -- Sasha | ||
+ | * [https://logbooks.jlab.org/entry/4151955 TAGM ccdb fiber_quality table error corrected] -- Richard | ||
+ | * End of run plan executed: | ||
+ | *# solenoid ramp-down started 14:10 | ||
+ | *# raw mode data collected during ramp-down | ||
+ | *# many fdc current trips, understood these were expected | ||
+ | *# solenoid ramp-down completed at 18:40 -- earlier than expected? | ||
+ | *# current reduced to 50nA, still seeing fdc trips | ||
+ | *# straight track runs taken in both raw mode and regular mode | ||
+ | *# straight track run plan completed, continued taking straight-track data in mode 9 | ||
+ | *# beam taken away by MCC as planned at 6:00 | ||
+ | *# target shutdown initiated at 6:15 | ||
+ | |||
+ | ===Issues=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4151502 occasional y position instability] | ||
+ | * [https://logbooks.jlab.org/entry/4151513 occasional daq problems, experts consulted] | ||
+ | * [https://logbooks.jlab.org/entry/4151529 TOF sector HV dropped w/o alarm, recovered] | ||
+ | * [https://logbooks.jlab.org/entry/4151570 DIRC tile temperature alarms] | ||
+ | |||
+ | ===Plans=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4151011 straight track running plan] -- completed | ||
+ | * BCAL LED calibration data collection -- underway | ||
+ | * cosmic data collection -- after BCAL LED runs plan completed | ||
+ | |||
+ | ==Friday March 17== | ||
+ | ===Past 24 hours=== | ||
+ | * Dropped to RESTRICTED for tours at 3:45pm 3/16 | ||
+ | ** Temperature in the hall rose to >77 degrees, recovered in time | ||
+ | ** Visits ended by 7:00pm | ||
+ | ** Hall D swept and requested beam restoration | ||
+ | ** Started off with new harp scans, then continued production | ||
+ | * Beam accounting point of interest: tour down was counted as BANU | ||
+ | |||
+ | ===Shift Summaries=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4150016 Thursday day shift] | ||
+ | * [https://logbooks.jlab.org/entry/4150177 Thursday swing shift] | ||
+ | * [https://logbooks.jlab.org/entry/4150335 Thursday owl shift] | ||
+ | * [https://logbooks.jlab.org/entry/4150419 Friday early riser shift] | ||
+ | |||
+ | ===Reports=== | ||
+ | * [https://logbooks.jlab.org/entry/4150530 one fcal base changed] | ||
+ | * more raw mode data taken (run 121163) around noon | ||
+ | * [https://logbooks.jlab.org/entry/4150742 Beam energy variation over 2023 run] | ||
+ | * [https://logbooks.jlab.org/entry/4150743 Beam current stability] | ||
+ | * [https://logbooks.jlab.org/entry/4150878 Beam position stability] | ||
+ | |||
+ | ===Issues=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)], recovered by power cycling rocbcal7 | ||
+ | * [https://logbooks.jlab.org/entry/4150587 TAGM column 16, fadc250 stopped counting] in middle of run around noon, run ended, recovered by power cycling roctagm1 | ||
+ | * Problem writing raw data to tape resolved, transfer to tape resumed | ||
+ | * Issue writing to local disk blocked DAQ during 121161, resolved by Sergey and running resumed | ||
+ | * Lockup of fcal bases continues regularly, resolved by reset procedure at the end of run (or sometimes on its own!) | ||
+ | * Problems with radiator harp scans happened again, resolved by Hovanes restarting IOC, https://logbooks.jlab.org/entry/4150880 working again at 9:45pm] | ||
+ | * Coherent edge (blue points) on CBREM gui spectrum not updating, work-around by bringing up separate fit tool | ||
+ | |||
+ | ===Plans=== | ||
+ | * Another high current run at 900 nA during the day today? | ||
+ | ** [https://logbooks.jlab.org/entry/4150494 we still have ~8hr of 900nA running in our allowance] -- discussed at 8:00 meeting | ||
+ | ** main participants needed: Justin, Sasha, Lubomir, Naomi | ||
+ | ** trigger conditions already established for stable DAQ at 75kHz event rate @ 900nA [https://logbooks.jlab.org/entry/4150252][https://logbooks.jlab.org/entry/4150309] | ||
+ | * Continue running production | ||
+ | * Straight-track run ~50nA | ||
+ | ** planned for March 19th Sunday swing | ||
+ | ** magnetic field ramped down | ||
+ | ** access not required | ||
+ | ** people to contact: Justin, Sasha, Lubomir, Naomi | ||
+ | * After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun | ||
+ | |||
+ | ==Plans on Accelerator Side== | ||
+ | * Hall C running continues, no apparent issues that might interrupt them before Monday | ||
+ | |||
+ | ===Regular Production Cycle=== | ||
+ | *Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **'''3''' runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
==Thursday March 16== | ==Thursday March 16== | ||
===Past 24 hours=== | ===Past 24 hours=== | ||
Line 16: | Line 122: | ||
** main participants Justin, Sasha, Lubomir, Naomi | ** main participants Justin, Sasha, Lubomir, Naomi | ||
** trigger conditions eventually found that allow running at 75kHz data rate @ 900nA [https://logbooks.jlab.org/entry/4150252][https://logbooks.jlab.org/entry/4150309] | ** trigger conditions eventually found that allow running at 75kHz data rate @ 900nA [https://logbooks.jlab.org/entry/4150252][https://logbooks.jlab.org/entry/4150309] | ||
− | |||
− | |||
− | |||
− | |||
− | ===Shift | + | ===Shift Summaries=== |
− | + | ||
− | *[https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4150016 Wednesday day shift] |
− | *[https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4150177 Wednesday swing shift] |
− | *[https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4150335 Wednesday owl shift] |
− | *[https://logbooks.jlab.org/entry/4149895 | + | * [https://logbooks.jlab.org/entry/4149895 Thursday early riser shift] |
− | + | ||
===Reports=== | ===Reports=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* [https://logbooks.jlab.org/entry/4150494#comment-44083 Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)] | * [https://logbooks.jlab.org/entry/4150494#comment-44083 Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)] | ||
Line 40: | Line 136: | ||
===Issues=== | ===Issues=== | ||
− | |||
− | |||
− | |||
− | |||
− | * [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)] | + | * [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)], suggest FADC250 replacement |
===Plans=== | ===Plans=== |
Latest revision as of 07:13, 20 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook
Contents
Monday March 20
Past 72 hours
Shift Summaries
- Friday day shift
- Friday swing shift
- Friday owl shift
- Saturday early riser shift
- Saturday day shift
- Saturday swing shift
- Saturday owl shift
- Sunday early riser shift
- Sunday day shift
- Sunday swing shift
- Sunday owl shift
- Monday early riser shift
Reports
- omega yields at 900nA -- Justin
- TAGM bunch time structure -- Hovanes
- occasional rapid access for tending PS test setup -- Sasha
- TAGM ccdb fiber_quality table error corrected -- Richard
- End of run plan executed:
- solenoid ramp-down started 14:10
- raw mode data collected during ramp-down
- many fdc current trips, understood these were expected
- solenoid ramp-down completed at 18:40 -- earlier than expected?
- current reduced to 50nA, still seeing fdc trips
- straight track runs taken in both raw mode and regular mode
- straight track run plan completed, continued taking straight-track data in mode 9
- beam taken away by MCC as planned at 6:00
- target shutdown initiated at 6:15
Issues
- occasional y position instability
- occasional daq problems, experts consulted
- TOF sector HV dropped w/o alarm, recovered
- DIRC tile temperature alarms
Plans
- straight track running plan -- completed
- BCAL LED calibration data collection -- underway
- cosmic data collection -- after BCAL LED runs plan completed
Friday March 17
Past 24 hours
- Dropped to RESTRICTED for tours at 3:45pm 3/16
- Temperature in the hall rose to >77 degrees, recovered in time
- Visits ended by 7:00pm
- Hall D swept and requested beam restoration
- Started off with new harp scans, then continued production
- Beam accounting point of interest: tour down was counted as BANU
Shift Summaries
Reports
- one fcal base changed
- more raw mode data taken (run 121163) around noon
- Beam energy variation over 2023 run
- Beam current stability
- Beam position stability
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), recovered by power cycling rocbcal7
- TAGM column 16, fadc250 stopped counting in middle of run around noon, run ended, recovered by power cycling roctagm1
- Problem writing raw data to tape resolved, transfer to tape resumed
- Issue writing to local disk blocked DAQ during 121161, resolved by Sergey and running resumed
- Lockup of fcal bases continues regularly, resolved by reset procedure at the end of run (or sometimes on its own!)
- Problems with radiator harp scans happened again, resolved by Hovanes restarting IOC, https://logbooks.jlab.org/entry/4150880 working again at 9:45pm]
- Coherent edge (blue points) on CBREM gui spectrum not updating, work-around by bringing up separate fit tool
Plans
- Another high current run at 900 nA during the day today?
- we still have ~8hr of 900nA running in our allowance -- discussed at 8:00 meeting
- main participants needed: Justin, Sasha, Lubomir, Naomi
- trigger conditions already established for stable DAQ at 75kHz event rate @ 900nA [1][2]
- Continue running production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
- After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday March 16
Past 24 hours
- Tagger Hall Access requested by Hovanes
- came as a surprise to RADCON and MCC crew
- discussion during the 8:00 meeting
- we can do better
- High current run(900 nA)
Shift Summaries
Reports
- Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)
- Summary of trigger threshold scan and 1 billion events collected at 900 nA
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), suggest FADC250 replacement
Plans
- Continue running production
- Visitors tour of Hall D starts at 4:45pm 3/16
- Data collection should end sometime after 4:00pm, when convenient before 4:20
- Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
- Ask them to contact RADCON to sweep Hall D for the visit
- Visit should end by 6:45pm
- As soon as they leave, put Hall D back in Power Permit and request beam restoration
- Start off with new harp scans, then continue production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)