Difference between revisions of "Run Planning Meeting Notes, December 15 - December 19, 2022"
From GlueXWiki
(→Shift Summaries) |
(→Monday Dec. 19th) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
[https://logbooks.jlab.org/book/hdlog Hall D Logbook] | [https://logbooks.jlab.org/book/hdlog Hall D Logbook] | ||
+ | |||
+ | = Monday Dec. 19th = | ||
+ | === Last 24h === | ||
+ | * Continued data taking on full target, solenoid off, CDC & FDC off | ||
+ | * Quick access to hall for repositioning of FCAL prototype | ||
+ | * Sasha did a transmission test with 3.4 mm collimator | ||
+ | * Monday 7:00 am, MCC turns off beam for holiday preps | ||
+ | * 1268 + 730 + 1447 + 822 M triggers | ||
+ | * ABUs = 378 + 358 + 405 = 19 hours | ||
+ | |||
+ | === Shift Summaries === | ||
+ | *Day shift 12/18 10:00-16:00 https://logbooks.jlab.org/entry/4103021 | ||
+ | *Swing shift 12/18 16:00-22:00 https://logbooks.jlab.org/entry/4103091 | ||
+ | *OWL 12/13-12/18 22:00-04:00 https://logbooks.jlab.org/entry/4103195 | ||
+ | *Early Riser 12/19 04:00-10:00 https://logbooks.jlab.org/entry/4103259 | ||
+ | |||
+ | === PD Summary === | ||
+ | https://logbooks.jlab.org/entry/4103372 | ||
+ | |||
+ | === Issues === | ||
+ | FCAL channels 47:53 and 29:2 | ||
+ | |||
+ | === Short term run plan === | ||
+ | * End-of-run party at 3 pm in Residence Facility | ||
+ | |||
+ | = Sunday Dec. 18th = | ||
+ | === Last 24h === | ||
+ | * solenoid off | ||
+ | * 1359 + 1102 + 521 + 864 = 3850 M triggers | ||
+ | * ABUs = 117 + 371 + [https://logbooks.jlab.org/entry/4102866 386] = | ||
+ | * FCAL prototype repositioning | ||
+ | * cosmic run during beam off | ||
+ | === Shift Summaries === | ||
+ | *Day shift 12/17 10:00-16:00 https://logbooks.jlab.org/entry/4102776 | ||
+ | *Swing shift 12/17 16:00-22:00 https://logbooks.jlab.org/entry/4102862 | ||
+ | *OWL 12/13-12/17 22:00-04:00 https://logbooks.jlab.org/entry/4102926 | ||
+ | *Early Riser 12/18 04:00-10:00 https://logbooks.jlab.org/entry/4102978 | ||
+ | |||
+ | === Issues === | ||
+ | Two FCAL bases; HV power cycle | ||
+ | |||
+ | |||
+ | === Short term run plan === | ||
= Saturday Dec. 17th = | = Saturday Dec. 17th = | ||
Line 18: | Line 61: | ||
*Day shift 12/16 10:00-16:00 https://logbooks.jlab.org/entry/4102436 | *Day shift 12/16 10:00-16:00 https://logbooks.jlab.org/entry/4102436 | ||
*Swing shift 12/16 16:00-22:00 https://logbooks.jlab.org/entry/4102529 | *Swing shift 12/16 16:00-22:00 https://logbooks.jlab.org/entry/4102529 | ||
− | *OWL 12/13-12/16 22:00-04:00 https://logbooks.jlab.org/entry/ | + | *OWL 12/13-12/16 22:00-04:00 https://logbooks.jlab.org/entry/4102607 |
− | *Early Riser 12/17 04:00-10:00 https://logbooks.jlab.org/entry/ | + | *Early Riser 12/17 04:00-10:00 https://logbooks.jlab.org/entry/4102683 |
=== Issues === | === Issues === |
Latest revision as of 12:01, 19 December 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Monday Dec. 19th
Last 24h
- Continued data taking on full target, solenoid off, CDC & FDC off
- Quick access to hall for repositioning of FCAL prototype
- Sasha did a transmission test with 3.4 mm collimator
- Monday 7:00 am, MCC turns off beam for holiday preps
- 1268 + 730 + 1447 + 822 M triggers
- ABUs = 378 + 358 + 405 = 19 hours
Shift Summaries
- Day shift 12/18 10:00-16:00 https://logbooks.jlab.org/entry/4103021
- Swing shift 12/18 16:00-22:00 https://logbooks.jlab.org/entry/4103091
- OWL 12/13-12/18 22:00-04:00 https://logbooks.jlab.org/entry/4103195
- Early Riser 12/19 04:00-10:00 https://logbooks.jlab.org/entry/4103259
PD Summary
https://logbooks.jlab.org/entry/4103372
Issues
FCAL channels 47:53 and 29:2
Short term run plan
- End-of-run party at 3 pm in Residence Facility
Sunday Dec. 18th
Last 24h
- solenoid off
- 1359 + 1102 + 521 + 864 = 3850 M triggers
- ABUs = 117 + 371 + 386 =
- FCAL prototype repositioning
- cosmic run during beam off
Shift Summaries
- Day shift 12/17 10:00-16:00 https://logbooks.jlab.org/entry/4102776
- Swing shift 12/17 16:00-22:00 https://logbooks.jlab.org/entry/4102862
- OWL 12/13-12/17 22:00-04:00 https://logbooks.jlab.org/entry/4102926
- Early Riser 12/18 04:00-10:00 https://logbooks.jlab.org/entry/4102978
Issues
Two FCAL bases; HV power cycle
Short term run plan
Saturday Dec. 17th
Last 24h
- Cycled TAGH HV crate; communication restored
- Took data on empty target (w/out the extra acrylic dummy)
- Filled target; took one good 2 hour run
Shift Summaries
- Day shift 12/16 10:00-16:00 https://logbooks.jlab.org/entry/4102436
- Swing shift 12/16 16:00-22:00 https://logbooks.jlab.org/entry/4102529
- OWL 12/13-12/16 22:00-04:00 https://logbooks.jlab.org/entry/4102607
- Early Riser 12/17 04:00-10:00 https://logbooks.jlab.org/entry/4102683
Issues
Short term run plan
- Continue taking data on full target, CDC & FDC HV off, field 0T
Friday Dec. 16th
Last 24h
- removed dummy target dwonstream of magnet
- Got 792 M triggers
- AI for CDC HV is off (tried turning off, but alrady was off); should not regulate with empty target anyhow.
- ABU: 5.3+4.0+6.2
Shift Summaries
- Day shift 12/13 10:00-16:00 https://logbooks.jlab.org/entry/
- Swing shift 12/13 16:00-22:00 https://logbooks.jlab.org/entry/
- OWL 12/13-12/14 22:00-04:00 https://logbooks.jlab.org/entry/
- Early Riser 12/14 04:00-10:00 Leader
Issues
- TAGH HV alarms; scalers are running; communication problem; might need access to power cycle the crate
Short term run plan
- Sometime today fill target; later (Saturday?) ramp down solenoid
Thursday Dec. 15th
Last 24h
- Mounted dummy target dwonstream of magnet
- Got 1.1B triggers
Shift Summaries
- Day shift 12/13 10:00-16:00 https://logbooks.jlab.org/entry/
- Swing shift 12/13 16:00-22:00 https://logbooks.jlab.org/entry/4100910
- OWL 12/13-12/14 22:00-04:00 https://logbooks.jlab.org/entry/4101072
- Early Riser 12/14 04:00-10:00 https://logbooks.jlab.org/entry/4101306
Issues
- No signal from BCAL scalers
Short term run plan
- Access to hall to remove "dummy" plastic disk in downstream end of solenoid