Difference between revisions of "April 22, 2022 Tech group SAD meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
== Agenda == | == Agenda == | ||
− | * Safety - | + | * Safety - poly tank fell off truck |
* Work location status | * Work location status | ||
+ | * still no budget to buy FCAL2 stuff | ||
* Accelerator schedule - HCO starts soon | * Accelerator schedule - HCO starts soon | ||
* Hall D SAD Tasks | * Hall D SAD Tasks |
Latest revision as of 10:15, 22 April 2022
Meeting Time and Place =
Friday April 22 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - poly tank fell off truck
- Work location status
- still no budget to buy FCAL2 stuff
- Accelerator schedule - HCO starts soon
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move/Hodoscope - poly shielding complete
- Moveable Lead absorber - Tim to Write procedure
- Target - Bobby - fit check - need drawings
- Gas - Scot
- Helium bag
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- matching mu metal to steel shields
- cutting tool
- Tagger NMR repair - Scot
- Tagger controls UPS
- BCAL Coldshot Chiller commissioning - Josh
- Target/Goni Turbo repair - Keith
- TEDF move in May to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation - Anthony gave presentation - file and instructions on O drive
- FCAL Insert Drawings
- New Profiler install
- New 3x3 CCAL for TAC Media:CPP_TAC.pdf
- Tagger Radiator Mod Media:Fork_mod.pdf
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Josh
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Prepare for HCO
- Set up next PS parasitic meeting