Difference between revisions of "April 14, 2022 KLONG Phase II Design Meeting"
From GlueXWiki
(→Agenda) |
(→Minutes) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* MRI Progress | * MRI Progress | ||
* CPP Update | * CPP Update | ||
− | * Tungsten absorber thermal analysis | + | * Charged particle background - Mikhail |
+ | * Tungsten absorber thermal analysis - Tim | ||
== Requirements and things to finalize == | == Requirements and things to finalize == | ||
Line 19: | Line 20: | ||
** Use existing Cryo target cart | ** Use existing Cryo target cart | ||
** 90 l/min LCW needed | ** 90 l/min LCW needed | ||
+ | * MRI integration meetings | ||
** Flux monitor downstream edge is 4m from PS magnet center | ** Flux monitor downstream edge is 4m from PS magnet center | ||
** Requirements for beamline downstream of collimator cave [[media:Igor's_layout.pdf]] | ** Requirements for beamline downstream of collimator cave [[media:Igor's_layout.pdf]] | ||
Line 26: | Line 28: | ||
== Minutes == | == Minutes == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Action Items == | == Action Items == |
Latest revision as of 06:52, 13 April 2022
Contents
Meeting Time and Place
Thursday April 14, 2022, 1pm
Zoom https://jlab-org.zoomgov.com/j/1611857466?pwd=VEZndTZzdDdNOUdJU3NxblRLcVoxdz09&from=addon
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin,
Mikhail Bashkanov, Anthony Palazzo, Eugene Chudakov, Mark Stevens
Agenda
Phase II is the section downstream of the collimator cave shield wall through the liquid target
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting
- MRI Progress
- CPP Update
- Charged particle background - Mikhail
- Tungsten absorber thermal analysis - Tim
Requirements and things to finalize
- 6 cm beam tube through Pair Spec magnet to cryo target (1.5 - 2mm wall thickness ok)
- Remove PS vacuum chamber and put in 6cm beampipe
- Use existing Cryo target cart
- 90 l/min LCW needed
- MRI integration meetings
- Flux monitor downstream edge is 4m from PS magnet center
- Requirements for beamline downstream of collimator cave media:Igor's_layout.pdf
- Mikhail Flux Monitor Presentation media:Fluxmonitor_2022.pdf
- link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
- Link to Hall A/C CPS talk - https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf