== Agenda == | == Agenda == | ||
* Safety - fuel spill | * Safety - fuel spill | ||
+ | * OccMed DR on site now | ||
+ | * Run around May 25 | ||
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]] | * Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]] | ||
** CPP INstall O:\halld_engineering\Installation Schedules | ** CPP INstall O:\halld_engineering\Installation Schedules | ||
− | *** Microscope move/Hodoscope plate #7 | + | *** Microscope move/Hodoscope plate #7 [[image:hodo_paddle.png|thumb]] |
*** Moveable Lead absorber | *** Moveable Lead absorber | ||
− | *** Target - Bobby [[ | + | *** Target - Bobby [[Media:CPP_Target_fid.pdf]] |
*** Gas - Scot | *** Gas - Scot | ||
*** Helium bag [[Media:CPP_He_Bag.pdf]] | *** Helium bag [[Media:CPP_He_Bag.pdf]] | ||
− | |||
− | |||
** PS Parasitic Detectors stages | ** PS Parasitic Detectors stages | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication | ||
*** 40 brass straps per week needed | *** 40 brass straps per week needed | ||
− | *** | + | *** matching mu metal to steel shields |
− | *** | + | *** cutting tool |
** Tagger NMR repair - Scot | ** Tagger NMR repair - Scot | ||
** FDC chiller repair - Josh | ** FDC chiller repair - Josh | ||
** BCAL Coldshot Chiller commissioning - Josh | ** BCAL Coldshot Chiller commissioning - Josh | ||
** Target Turbo repair - Keith | ** Target Turbo repair - Keith | ||
− | ** TEDF move in | + | ** TEDF move in May to EEL stockroom area |
* JT file creation | * JT file creation | ||
* FCAL Insert Drawings | * FCAL Insert Drawings | ||
+ | * New Polarimeter install | ||
+ | * New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]] | ||
* Controls | * Controls | ||
** Solenoid vacuum controls | ** Solenoid vacuum controls | ||
* General Maintenance | * General Maintenance | ||
− | * On Call - | + | * On Call - Scot |
* ePAS Training and trial https://www.jlab.org/esh/epas | * ePAS Training and trial https://www.jlab.org/esh/epas | ||
== Action Items == | == Action Items == | ||
− | * Set up PS parasitic meeting | + | * Set up next PS parasitic meeting |
* Decide on Goni maintenance | * Decide on Goni maintenance | ||
− | * Delineate ePAS permit requests for | + | * Delineate ePAS permit requests for Isolation Certificate |
Latest revision as of 08:29, 1 April 2022
Meeting Time and Place =
Friday April 1, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - fuel spill
- OccMed DR on site now
- Run around May 25
- Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move/Hodoscope plate #7
- Moveable Lead absorber
- Target - Bobby Media:CPP_Target_fid.pdf
- Gas - Scot
- Helium bag Media:CPP_He_Bag.pdf
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- matching mu metal to steel shields
- cutting tool
- Tagger NMR repair - Scot
- FDC chiller repair - Josh
- BCAL Coldshot Chiller commissioning - Josh
- Target Turbo repair - Keith
- TEDF move in May to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- New Polarimeter install
- New 3x3 CCAL for TAC Media:CPP_TAC.pdf
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Scot
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Set up next PS parasitic meeting
- Decide on Goni maintenance
- Delineate ePAS permit requests for Isolation Certificate