Difference between revisions of "February 17, 2022 KLONG Phase II Design Meeting"
From GlueXWiki
(→Meeting Time and Place) |
(→Action Items) |
||
(14 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
== Agenda == | == Agenda == | ||
+ | Phase II is the section downstream of the collimator cave shield wall through the liquid target | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_20_2022_KLONG_Phase_II_Design_Meeting | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_20_2022_KLONG_Phase_II_Design_Meeting | ||
− | * | + | * Platform load rating is 17000 lbs (7.7 tonnes)- will be good to hold MRI |
− | * | + | * 3D model layout progress |
+ | * FLUKA model updates | ||
== Requirements and things to finalize == | == Requirements and things to finalize == | ||
− | ** 6 cm beam tube through Pair Spec magnet to cryo target | + | ** 6 cm beam tube through Pair Spec magnet to cryo target (1.5 - 2mm wall thickness ok) |
** Remove PS vacuum chamber and put in 6cm beampipe | ** Remove PS vacuum chamber and put in 6cm beampipe | ||
+ | ** Use existing Cryo target cart | ||
+ | ** 90 l/min LCW needed | ||
+ | ** Flux monitor downstream edge is 4m from PS magnet center | ||
+ | ** Requirements for beamline downstream of collimator cave [[media:Igor's_layout.pdf]] | ||
+ | ** Mikhail Flux Monitor Presentation [[media:Fluxmonitor_2022.pdf]] | ||
+ | ** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page | ||
+ | ** Link to Hall A/C CPS talk - https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf | ||
== Minutes == | == Minutes == | ||
− | * Briefly discussed minutes from | + | * Briefly discussed minutes from January meeting |
− | * | + | * Vitaly asked about beam pipe inside PS magnet - will be 6.35 cm OD x 6.03cm ID 316 stainless steel |
− | * | + | * Discussion about magnet effects of beam tube - 3166 SS has a permeability of around 1.2 so should have no significant forces. |
− | * | + | * Need to look at magnetic affects of adjacent PS magnet |
− | * | + | * We will be using the same target cart as the existing Gluex hydrogen target |
− | * | + | * Discussion of possible shielding DS to protect CDC, FDC and electronics |
− | * | + | * Flux monitor detectors are just upstream and downstream of MRI |
− | ** | + | * Keith showed best guess at MRI dimensions |
− | ** | + | ** Center of MRI is 15cm above beamline. Beamline is 30 cm above lower edge of MRI bore. |
− | ** | + | ** Platform rated for over 7 tonnes |
− | + | ** Keith found additional documentation on field map and power/cooling requirements | |
− | + | * Vitaly has FLUKA working with magnetic fields and will look at CPS copper energy absorption | |
− | + | * Tim still needs to run heat numbers from Vitaly for the berylium and tungsten to verify cooling system | |
− | + | ||
− | + | ||
− | * Vitaly | + | |
− | + | ||
− | + | ||
− | * | + | |
− | + | ||
− | + | ||
− | + | ||
== Action Items == | == Action Items == | ||
− | * | + | * Keith to continue getting more geometry info on MRI for the model |
− | + | * Tim to look at tungsten heat removal | |
* Set up future meetings | * Set up future meetings |
Latest revision as of 11:04, 18 February 2022
Contents
Meeting Time and Place
Thursday February 17, 2022, 1pm
Zoom https://jlab-org.zoomgov.com/j/1611857466?pwd=VEZndTZzdDdNOUdJU3NxblRLcVoxdz09&from=addon
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin,
Mikhail Bashkanov, Anthony Palazzo, Eugene Chudakov, Mark Stevens
Agenda
Phase II is the section downstream of the collimator cave shield wall through the liquid target
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_20_2022_KLONG_Phase_II_Design_Meeting
- Platform load rating is 17000 lbs (7.7 tonnes)- will be good to hold MRI
- 3D model layout progress
- FLUKA model updates
Requirements and things to finalize
- 6 cm beam tube through Pair Spec magnet to cryo target (1.5 - 2mm wall thickness ok)
- Remove PS vacuum chamber and put in 6cm beampipe
- Use existing Cryo target cart
- 90 l/min LCW needed
- Flux monitor downstream edge is 4m from PS magnet center
- Requirements for beamline downstream of collimator cave media:Igor's_layout.pdf
- Mikhail Flux Monitor Presentation media:Fluxmonitor_2022.pdf
- link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page
- Link to Hall A/C CPS talk - https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf
Minutes
- Briefly discussed minutes from January meeting
- Vitaly asked about beam pipe inside PS magnet - will be 6.35 cm OD x 6.03cm ID 316 stainless steel
- Discussion about magnet effects of beam tube - 3166 SS has a permeability of around 1.2 so should have no significant forces.
- Need to look at magnetic affects of adjacent PS magnet
- We will be using the same target cart as the existing Gluex hydrogen target
- Discussion of possible shielding DS to protect CDC, FDC and electronics
- Flux monitor detectors are just upstream and downstream of MRI
- Keith showed best guess at MRI dimensions
- Center of MRI is 15cm above beamline. Beamline is 30 cm above lower edge of MRI bore.
- Platform rated for over 7 tonnes
- Keith found additional documentation on field map and power/cooling requirements
- Vitaly has FLUKA working with magnetic fields and will look at CPS copper energy absorption
- Tim still needs to run heat numbers from Vitaly for the berylium and tungsten to verify cooling system
Action Items
- Keith to continue getting more geometry info on MRI for the model
- Tim to look at tungsten heat removal
- Set up future meetings