Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"
From GlueXWiki
(→Monday, September 27) |
(→Wednesday, September 29) |
||
(57 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
<- Back to [[Run Coordination Meetings:Summer2021]] | <- Back to [[Run Coordination Meetings:Summer2021]] | ||
+ | |||
+ | =Wednesday, September 29= | ||
+ | #In last 24 hours: | ||
+ | #* Early Riser: https://logbooks.jlab.org/entry/3914295 | ||
+ | #* Owl summary: https://logbooks.jlab.org/entry/3914209 | ||
+ | #* Swing summary: https://logbooks.jlab.org/entry/3913887 | ||
+ | #* CDC baseline calibration https://logbooks.jlab.org/entry/3913755 (Bene) | ||
+ | #* FCAL HV scan https://logbooks.jlab.org/entry/3913887 (Simon) https://logbooks.jlab.org/entry/3913909 (ig) | ||
+ | #* Beam was back around 7:30 pm | ||
+ | #** Radiation level https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3913887 (Alexandre) | ||
+ | #** HARP scan https://logbooks.jlab.org/entry/3914082 | ||
+ | #** Be 200 nA https://logbooks.jlab.org/entry/3914169 (Sasha): ~1B trigger (1.6/10) | ||
+ | #* Beam away at 6:30 am until 6 pm (maintenance day) | ||
+ | #Issues: | ||
+ | #* FCAL: | ||
+ | #** Dead channels https://logbooks.jlab.org/entry/3914386 (ig) | ||
+ | #** 53 suspicious channels https://logbooks.jlab.org/entry/3913947 https://logbooks.jlab.org/entry/3913739 (Rebecca/Mark/Malte) | ||
+ | #* Sweep magnet turn off https://logbooks.jlab.org/entry/3913900 (Simon) | ||
+ | #* Bleedthrough | ||
+ | #[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
+ | #* [https://logbooks.jlab.org/entry/3913494 Before taking data: check radiation level and beam quality] (HARP scan) | ||
+ | #* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around | ||
+ | #* 100 nA CDC & FDC turn off (2 shifts) | ||
+ | #* 200 nA CDC & FDC turn off (8.4 shifts) | ||
+ | #* Remove Be target to take empty target | ||
+ | |||
+ | =Tuesday, September 28= | ||
+ | #In last 24 hours: | ||
+ | #* No beam | ||
+ | #Issues: | ||
+ | #* Follow-up on possible SC issue https://logbooks.jlab.org/entry/3913352 | ||
+ | #* 53 FCAL blocks are suspicious https://logbooks.jlab.org/entry/3913620 | ||
+ | #* Bleedthrough | ||
+ | #[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
+ | #* RadCon will sweep HallD around 1 pm | ||
+ | #* Be with 50nA and both chambers turn on (two shifts) | ||
+ | |||
=Monday, September 27= | =Monday, September 27= | ||
# In last 72 hours: | # In last 72 hours: | ||
− | #* | + | #* Swing summary:https://logbooks.jlab.org/entry/3912624 |
− | + | ||
− | + | ||
#* Day summary: https://logbooks.jlab.org/entry/3912503 | #* Day summary: https://logbooks.jlab.org/entry/3912503 | ||
#* Early Riser summary: https://logbooks.jlab.org/entry/3912341 | #* Early Riser summary: https://logbooks.jlab.org/entry/3912341 | ||
#* Owl summary: https://logbooks.jlab.org/entry/3912249 | #* Owl summary: https://logbooks.jlab.org/entry/3912249 | ||
#* Swing summary: https://logbooks.jlab.org/entry/3912060 | #* Swing summary: https://logbooks.jlab.org/entry/3912060 | ||
− | #* | + | #* Sunday 8am to Monday 8am summary: no beam |
− | #* Check radiation level | + | #** FDC1 Cell1 efficiency went up https://logbooks.jlab.org/entry/3913057 (Lubomir) |
− | #* HARP scan | + | #** New TAGH HV https://logbooks.jlab.org/entry/3913029 (Sasha) |
+ | #** FCAL pi0 calibration divided into 3 period: Summer 2020 HV, Summer 2020 HV - 6V, and Fall 2021 HV (214 HV adjusted) https://logbooks.jlab.org/entry/3913166 (ig) | ||
+ | #* Saturday 8am to Sunday 8am summary: | ||
+ | #** No beam from 10am to 7pm | ||
+ | #** Beni & Richard debugged TAGM | ||
+ | #** Check radiation level https://logbooks.jlab.org/entry/3912624 | ||
+ | #** HARP scan https://logbooks.jlab.org/entry/3912630 https://logbooks.jlab.org/entry/3912624 | ||
+ | #** Beam was off, asked to tune, FSD trip -> no beam until Monday | ||
+ | #* Friday am to Saturday 8am summary: | ||
+ | #** Tagger NMR https://logbooks.jlab.org/entry/3912006 (Tim) | ||
+ | #** z position of Be target https://logbooks.jlab.org/entry/3911950 (Simon) | ||
+ | #** Remove absorber https://logbooks.jlab.org/entry/3911915 (Steven/PrimEx-eta) | ||
+ | #** FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060 | ||
+ | #** Beam back around 3 am (Saturday and no beam during most of Friday) | ||
+ | #** Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195 | ||
+ | #** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 | ||
# Issues | # Issues | ||
− | #* TAGM wrongly cabling (Beni/Richard) | + | #* TAGM wrongly cabling https://logbooks.jlab.org/entry/3912516 / https://logbooks.jlab.org/entry/3912822 (Beni/Richard) |
− | #* Beam | + | #* No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567 (Jay, PD) |
− | # Plan | + | #* TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490 (Hovanes) |
+ | #* Possible issue with SC https://logbooks.jlab.org/entry/3912992 (Sean) | ||
+ | #* Bleedthrough | ||
+ | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan] | ||
+ | #* Maintenance | ||
+ | #** FCAL https://logbooks.jlab.org/entry/3912930 (Rebecca/Malte/Mark) | ||
+ | #** Swap one MPGD prototype under test with a new one (Kondo/Lubomir) | ||
=Friday, September 24= | =Friday, September 24= |
Latest revision as of 20:54, 29 September 2021
<- Back to Run Coordination Meetings:Summer2021
Contents
Wednesday, September 29
- In last 24 hours:
- Early Riser: https://logbooks.jlab.org/entry/3914295
- Owl summary: https://logbooks.jlab.org/entry/3914209
- Swing summary: https://logbooks.jlab.org/entry/3913887
- CDC baseline calibration https://logbooks.jlab.org/entry/3913755 (Bene)
- FCAL HV scan https://logbooks.jlab.org/entry/3913887 (Simon) https://logbooks.jlab.org/entry/3913909 (ig)
- Beam was back around 7:30 pm
- Radiation level https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3913887 (Alexandre)
- HARP scan https://logbooks.jlab.org/entry/3914082
- Be 200 nA https://logbooks.jlab.org/entry/3914169 (Sasha): ~1B trigger (1.6/10)
- Beam away at 6:30 am until 6 pm (maintenance day)
- Issues:
- FCAL:
- Dead channels https://logbooks.jlab.org/entry/3914386 (ig)
- 53 suspicious channels https://logbooks.jlab.org/entry/3913947 https://logbooks.jlab.org/entry/3913739 (Rebecca/Mark/Malte)
- Sweep magnet turn off https://logbooks.jlab.org/entry/3913900 (Simon)
- Bleedthrough
- FCAL:
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
- 100 nA CDC & FDC turn off (2 shifts)
- 200 nA CDC & FDC turn off (8.4 shifts)
- Remove Be target to take empty target
Tuesday, September 28
- In last 24 hours:
- No beam
- Issues:
- Follow-up on possible SC issue https://logbooks.jlab.org/entry/3913352
- 53 FCAL blocks are suspicious https://logbooks.jlab.org/entry/3913620
- Bleedthrough
- Plan:
- RadCon will sweep HallD around 1 pm
- Be with 50nA and both chambers turn on (two shifts)
Monday, September 27
- In last 72 hours:
- Swing summary:https://logbooks.jlab.org/entry/3912624
- Day summary: https://logbooks.jlab.org/entry/3912503
- Early Riser summary: https://logbooks.jlab.org/entry/3912341
- Owl summary: https://logbooks.jlab.org/entry/3912249
- Swing summary: https://logbooks.jlab.org/entry/3912060
- Sunday 8am to Monday 8am summary: no beam
- FDC1 Cell1 efficiency went up https://logbooks.jlab.org/entry/3913057 (Lubomir)
- New TAGH HV https://logbooks.jlab.org/entry/3913029 (Sasha)
- FCAL pi0 calibration divided into 3 period: Summer 2020 HV, Summer 2020 HV - 6V, and Fall 2021 HV (214 HV adjusted) https://logbooks.jlab.org/entry/3913166 (ig)
- Saturday 8am to Sunday 8am summary:
- No beam from 10am to 7pm
- Beni & Richard debugged TAGM
- Check radiation level https://logbooks.jlab.org/entry/3912624
- HARP scan https://logbooks.jlab.org/entry/3912630 https://logbooks.jlab.org/entry/3912624
- Beam was off, asked to tune, FSD trip -> no beam until Monday
- Friday am to Saturday 8am summary:
- Tagger NMR https://logbooks.jlab.org/entry/3912006 (Tim)
- z position of Be target https://logbooks.jlab.org/entry/3911950 (Simon)
- Remove absorber https://logbooks.jlab.org/entry/3911915 (Steven/PrimEx-eta)
- FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060
- Beam back around 3 am (Saturday and no beam during most of Friday)
- Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195
- HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
- Issues
- TAGM wrongly cabling https://logbooks.jlab.org/entry/3912516 / https://logbooks.jlab.org/entry/3912822 (Beni/Richard)
- No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567 (Jay, PD)
- TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490 (Hovanes)
- Possible issue with SC https://logbooks.jlab.org/entry/3912992 (Sean)
- Bleedthrough
- Plan
- Maintenance
- FCAL https://logbooks.jlab.org/entry/3912930 (Rebecca/Malte/Mark)
- Swap one MPGD prototype under test with a new one (Kondo/Lubomir)
- Maintenance
Friday, September 24
- In last 24 hours:
- Early Riser summary: https://logbooks.jlab.org/entry/3911691
- Owl summary: https://logbooks.jlab.org/entry/3911625
- Swing summary: https://logbooks.jlab.org/entry/3911415
- Day summary: https://logbooks.jlab.org/entry/3911095
- Lubomir straight track studies
- Richard looked at the missing tagm channel issues https://logbooks.jlab.org/entry/3911033
- Rapid access between 1pm and 4pm
- FCAL bases changed (Mark) https://logbooks.jlab.org/entry/3911303
- FCAL FADC changed (Sasha) https://logbooks.jlab.org/entry/3911510
- Profiler removed and surveyed by RadCon (Tim)
- Be target survey/align (Chris) https://logbooks.jlab.org/entry/3911226
- Rapid access at 6pm to check FCAL FADCs
- FCAL HV tuning (ig) https://logbooks.jlab.org/entry/3911624
- Issues
- VME crate D2-2-TOP (ROCFCAL1) rebooting periodically (Malte) https://logbooks.jlab.org/entry/3911318
- Beam halo alarm (Hovanes) https://logbooks.jlab.org/entry/3911427
- LED DOWN trigger bit missing (Elton) https://logbooks.jlab.org/entry/3911427
- Roc issues preventing the DAQ to start
- Beam (eg MCC has a problem with the PS, there will be no beam for some time)
- Bleed through (Bill)
- Plan
- Compton with Be target at low intensity
Thursday, September 23
- In last 24 hours:
- Be target, 10-4 Radiator, ~11M triggers.
- Early Riser summary: https://logbooks.jlab.org/entry/3910318 (4am to 10am),
- Owl summary: https://logbooks.jlab.org/entry/3910862 (10pm to 4am)
- Swing summary: https://logbooks.jlab.org/entry/3910670 (4pm-10am)
- Day summary: https://logbooks.jlab.org/entry/3910458 (10am to 4pm),
- FCAL pi0 calibration and HV tuning started yesterday at 6 am, https://logbooks.jlab.org/entry/3910786
- With PMT HVs, gains, and pedestals of run 73065
- Then, we subtracted 6V to all PMT HV resulting in a reduction of roughly 5% on all gains
- Sergey made a rapid access to the experimental hall to power cycle NIM crate
- Beni changed the TOF HV a couple of times eg https://logbooks.jlab.org/entry/3910611
- Sergey did a BCAL pedestal runs,
- Sean time calibration https://logbooks.jlab.org/entry/3910464, https://logbooks.jlab.org/entry/3910484
- Sasha adjusted tagh HV
- Issues
- Beni did look at the bleedthrough issue by analyzing timing for different run condition https://logbooks.jlab.org/entry/3910680, https://logbooks.jlab.org/entry/3910800
- After entry to the experimental MCC struggle for almost one hour to send us beam
- Sean time calibration pointed to tagm issues that Richard will address
- FCAL issues, fADC died screwing the FCAL pi0 calibration run see report diphoton invariant mass distribution per ring https://halldweb.jlab.org/primexd/phase2/fcal2021_method0_period_2-g1/
- Full monitoring system (resolved ): back online. Rootspy, twice a day email feed.
- Hall Camera expected to come back online.
- Plan for the day
- tagm studies by Richard
- FDC straight track studies by Lubomir