Difference between revisions of "JEF meeting, July 23, 2021"
From GlueXWiki
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...") |
|||
Line 26: | Line 26: | ||
* Data analysis | * Data analysis | ||
* Simulations | * Simulations | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal, Bill B.,Phil, Sasha, Varun, Azizah, Liping, Jon, Arshak, Zisis, S.T. | ||
+ | * Sasha will follow up with SICCAS this weekend regarding status of raw material | ||
+ | ** Awaiting revised crystal delivery schedule | ||
+ | * Joanna from UNCW started working on wrapping crystals | ||
+ | * Sasha continuing refurbishment of COMCAL | ||
+ | ** SHV/lemo connectors installed | ||
+ | ** Will mount LMS plate today | ||
+ | ** Obtained new UV glue dispenser for use in attaching fibers to crystals | ||
+ | * Azizah and Varun started working on testing Island/default FCAL shower reconstruction |
Latest revision as of 13:17, 23 July 2021
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Module fabrication
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
Minutes
Attendees: Igal, Bill B.,Phil, Sasha, Varun, Azizah, Liping, Jon, Arshak, Zisis, S.T.
- Sasha will follow up with SICCAS this weekend regarding status of raw material
- Awaiting revised crystal delivery schedule
- Joanna from UNCW started working on wrapping crystals
- Sasha continuing refurbishment of COMCAL
- SHV/lemo connectors installed
- Will mount LMS plate today
- Obtained new UV glue dispenser for use in attaching fibers to crystals
- Azizah and Varun started working on testing Island/default FCAL shower reconstruction