Difference between revisions of "GlueX TOF Meeting, June 30, 2021"
(first draft) |
(added the minutes) |
||
Line 13: | Line 13: | ||
# TOF NIM paper | # TOF NIM paper | ||
# Action Item Recap | # Action Item Recap | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Present: Edmundo Barriga, Jason Barlow, Eugene Chudakov, Paul Eugenio, Mark Ito (chair), Sasha Ostrovidov, Simon Taylor, Tim Whitlatch, Beni Zihlmann | ||
+ | |||
+ | There is a [https://bluejeans.com/s/ew2W25oGUej/ recording of this meeting]. Log into the [https://jlab.bluejeans.com BlueJeans site] first to gain access (use your JLab credentials). | ||
+ | |||
+ | === PMT Repair === | ||
+ | |||
+ | Paul and Edmundo are planning their trip for July 12-16. Registration difficulties have been resolved. Paul's Rad worker testing is scheduled. They are bringing the equipment necessary to affect repairs, including 10 PMTs (only 2 are needed) and a vacuum chamber. | ||
+ | |||
+ | === Air Light Guides === | ||
+ | |||
+ | Minor point of historical significance only: the plan with the air light guides, now postponed indefinitely, was to install four of them, one for each pair of single-ended counters in the upstream plane, and assess performance. | ||
+ | |||
+ | === Loaned Equipment Return === | ||
+ | |||
+ | FSU has purchased a CAEN ADC and a Wiener VXS crate. These are to replace items loaned from the Lab. In addition to the 10 PMTs mentioned above, Paul and Edmundo will be bringing the Lab's ADC and crate with them for return. | ||
+ | |||
+ | === TOF II Trigger === | ||
+ | |||
+ | Beni reported that Hai Dong has completed writing the new firmware for the TOF CTP. The next step is downloading and testing. Eugene floated the idea of Sascha Somov doing the downloading and Sergey Furletov doing the testing. | ||
+ | |||
+ | === TOF NIM paper === | ||
+ | |||
+ | No new news. |
Latest revision as of 12:09, 30 June 2021
GlueX Time-of-Flight Meeting
Wednesday, June 30, 2021
10:00 am EDT
BlueJeans: 350 531 998
Contents
Agenda
- Announcements
- Review of minutes from the last meeting
- PMT Repair
- Air Light Guides
- TOF II Trigger
- TOF NIM paper
- Action Item Recap
Minutes
Present: Edmundo Barriga, Jason Barlow, Eugene Chudakov, Paul Eugenio, Mark Ito (chair), Sasha Ostrovidov, Simon Taylor, Tim Whitlatch, Beni Zihlmann
There is a recording of this meeting. Log into the BlueJeans site first to gain access (use your JLab credentials).
PMT Repair
Paul and Edmundo are planning their trip for July 12-16. Registration difficulties have been resolved. Paul's Rad worker testing is scheduled. They are bringing the equipment necessary to affect repairs, including 10 PMTs (only 2 are needed) and a vacuum chamber.
Air Light Guides
Minor point of historical significance only: the plan with the air light guides, now postponed indefinitely, was to install four of them, one for each pair of single-ended counters in the upstream plane, and assess performance.
Loaned Equipment Return
FSU has purchased a CAEN ADC and a Wiener VXS crate. These are to replace items loaned from the Lab. In addition to the 10 PMTs mentioned above, Paul and Edmundo will be bringing the Lab's ADC and crate with them for return.
TOF II Trigger
Beni reported that Hai Dong has completed writing the new firmware for the TOF CTP. The next step is downloading and testing. Eugene floated the idea of Sascha Somov doing the downloading and Sergey Furletov doing the testing.
TOF NIM paper
No new news.