Difference between revisions of "JEF meeting, June 4, 2021"
From GlueXWiki
(→Agenda) |
m (→Agenda) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 23: | Line 23: | ||
* SICCAS crystals | * SICCAS crystals | ||
* Module fabrication | * Module fabrication | ||
− | * UNCW 3D printing capabilities (Tim B.) | + | * [https://halldweb.jlab.org/wiki/images/3/38/3dprintingUNCW.pptx UNCW 3D printing capabilities] (Tim B.) |
* COMCAL tests, TAC running, etc. | * COMCAL tests, TAC running, etc. | ||
* Data analysis | * Data analysis | ||
** [https://halldweb.jlab.org/DocDB/0045/004506/001/etaprime_xsecs.pdf η' cross sections] (S.T.) | ** [https://halldweb.jlab.org/DocDB/0045/004506/001/etaprime_xsecs.pdf η' cross sections] (S.T.) | ||
* Simulations | * Simulations | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal,Sasha,Tim B.,Arshak,Zisis,Jane,Jon,Liping,ST. | ||
+ | * Still no news from SICCAS | ||
+ | ** Sasha emailed SICCAS contact to organize follow-up meeting regarding delivery schedule | ||
+ | *** Based on results of this meeting, might talk to Rolf regarding purchasing Crytur crystals | ||
+ | * No news on PMT base redesign | ||
+ | * Sasha continuing checking dividers for COMCAL | ||
+ | ** 20 dividers need to be modified | ||
+ | * Sasha working on COMCAL LMS assembly and commissioning | ||
+ | * Sasha planning to reapply optical grease on suspect COMCAL modules next week | ||
+ | * Module construction: Chris A. started brazing effort, working on procedure | ||
+ | * Tim B. presented UNCW 3d-printing capabilities | ||
+ | ** Possible items to print: PMT and LED holders | ||
+ | * Simon presented cross sections for η' production using η'→2γ |
Latest revision as of 15:15, 4 June 2021
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Module fabrication
- UNCW 3D printing capabilities (Tim B.)
- COMCAL tests, TAC running, etc.
- Data analysis
- η' cross sections (S.T.)
- Simulations
Minutes
Attendees: Igal,Sasha,Tim B.,Arshak,Zisis,Jane,Jon,Liping,ST.
- Still no news from SICCAS
- Sasha emailed SICCAS contact to organize follow-up meeting regarding delivery schedule
- Based on results of this meeting, might talk to Rolf regarding purchasing Crytur crystals
- Sasha emailed SICCAS contact to organize follow-up meeting regarding delivery schedule
- No news on PMT base redesign
- Sasha continuing checking dividers for COMCAL
- 20 dividers need to be modified
- Sasha working on COMCAL LMS assembly and commissioning
- Sasha planning to reapply optical grease on suspect COMCAL modules next week
- Module construction: Chris A. started brazing effort, working on procedure
- Tim B. presented UNCW 3d-printing capabilities
- Possible items to print: PMT and LED holders
- Simon presented cross sections for η' production using η'→2γ