Difference between revisions of "JEF meeting, January 8, 2021"
From GlueXWiki
(→Agenda) |
|||
Line 27: | Line 27: | ||
* Contributions to upcoming April APS/GHP meetings | * Contributions to upcoming April APS/GHP meetings | ||
#* [https://halldweb.jlab.org/wiki/images/b/b7/GHP2021.pdf GHP's abstract] | #* [https://halldweb.jlab.org/wiki/images/b/b7/GHP2021.pdf GHP's abstract] | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Sasha,Zisis,Susan,Igal,Jane,Tim B.,Jared,Phil,Jon,Varun,Liping,S.T. | ||
+ | * No news from SICCAS; plan to set up meeting with Chinese company to give feedback and discuss production plans | ||
+ | * Four modules have been constructed | ||
+ | * Lab in EEL was shut down briefly due to a COVID-19 issue, now open, Sasha will do linearity test of amplifiers used in PMT base redesign | ||
+ | * Loan agreement with Regina moving forward | ||
+ | * S.T. added code to implement the "Island" algorithm for FCAL reconstruction | ||
+ | * Sasha submitted an abstract to the upcoming APS meeting; Igal will submit an abstract to the GHP meeting |
Latest revision as of 08:43, 11 January 2021
Meeting time and location= 8:30 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- Contributions to upcoming April APS/GHP meetings
Minutes
Attendees: Sasha,Zisis,Susan,Igal,Jane,Tim B.,Jared,Phil,Jon,Varun,Liping,S.T.
- No news from SICCAS; plan to set up meeting with Chinese company to give feedback and discuss production plans
- Four modules have been constructed
- Lab in EEL was shut down briefly due to a COVID-19 issue, now open, Sasha will do linearity test of amplifiers used in PMT base redesign
- Loan agreement with Regina moving forward
- S.T. added code to implement the "Island" algorithm for FCAL reconstruction
- Sasha submitted an abstract to the upcoming APS meeting; Igal will submit an abstract to the GHP meeting