RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs.
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
- PS study for flux normalization
- CCAL test with 2nA beam to test new active basis
The most notable issues were
- Goniometer controler board has to be replaced
- It was difficult to nudge the coherent peak probably because the diamond degraded
- Few FCAL bases have to be replaced
- Minor DAQ problem
- Persisting solenoid alarm which was solved by resetting the CCG
In the end, the setup was shutdown.