Difference between revisions of "JEF meeting, September 11, 2020"
From GlueXWiki
(→Agenda) |
|||
(One intermediate revision by one other user not shown) | |||
Line 28: | Line 28: | ||
* Simulations | * Simulations | ||
* GlueX/JEF PAC presentation | * GlueX/JEF PAC presentation | ||
+ | : -[https://halldweb.jlab.org/JEF/pac_review.pptx Draft of FCAL2 upgrade slides] | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Josh, Liping, Jared, Phil, Jane, Zisis, Susan, Matt S., Sasha, Arshak, Jon, Bill B. | ||
+ | * We went over Liping's and Sasha's slides prepared for the PAC jeopardy presentation with Matt. | ||
+ | ** Matt will condense these to a few (PAC guidance is 20 minutes total for GlueX/JEF/DIRC presentation) | ||
+ | ** Emphasis should be on broadening JEF physics scope and FCAL-II upgrade updates | ||
+ | ** How to handle the possibility that there will be less than 100 days (original JEF beam request) left when FCAL-II on the floor? | ||
+ | *** Thought is that if we need to, we will go to back to the PAC to ask for additional beam time | ||
+ | * Another set of "good" crystals has been installed in the PS setup in the Hall | ||
+ | ** Relative amplitudes show 15-20% variation, all look good | ||
+ | ** Next: install several crystals with internal imperfections (bubbles, internal structures) | ||
+ | * SICCAS to finish next batch of crystals in near future -- delivery in October? | ||
+ | * Progress continues with PMT divider redesign -- 3 modified bases have been installed in COMCAL | ||
+ | ** Once design finalized, plane to order enough to refurbish whole CCAL for PrimeX | ||
+ | * Jared working with Phil and Igal on signal PDFs for dark matter searches, may present next week? |
Latest revision as of 07:48, 14 September 2020
Meeting time and location= 9:30 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Preparation for module fabrication
- COMCAL tests, TAC running, etc.
- Simulations
- GlueX/JEF PAC presentation
Minutes
Attendees: Josh, Liping, Jared, Phil, Jane, Zisis, Susan, Matt S., Sasha, Arshak, Jon, Bill B.
- We went over Liping's and Sasha's slides prepared for the PAC jeopardy presentation with Matt.
- Matt will condense these to a few (PAC guidance is 20 minutes total for GlueX/JEF/DIRC presentation)
- Emphasis should be on broadening JEF physics scope and FCAL-II upgrade updates
- How to handle the possibility that there will be less than 100 days (original JEF beam request) left when FCAL-II on the floor?
- Thought is that if we need to, we will go to back to the PAC to ask for additional beam time
- Another set of "good" crystals has been installed in the PS setup in the Hall
- Relative amplitudes show 15-20% variation, all look good
- Next: install several crystals with internal imperfections (bubbles, internal structures)
- SICCAS to finish next batch of crystals in near future -- delivery in October?
- Progress continues with PMT divider redesign -- 3 modified bases have been installed in COMCAL
- Once design finalized, plane to order enough to refurbish whole CCAL for PrimeX
- Jared working with Phil and Igal on signal PDFs for dark matter searches, may present next week?