Difference between revisions of "May 1,2020 Tech group meeting"
From GlueXWiki
(Created page with "Apr 29,2020 Tech group meeting Meeting Time and Place Friday May 1, 2020 at 9am Bluejeans https://bluejeans.com/835373169 Agenda Covid-19 https://www.nature.com/articles...") |
(→Agenda) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | == Meeting Time and Place == | |
− | Meeting Time and Place | + | Friday May 1, 2020 at 9am |
+ | Bluejeans https://bluejeans.com/835373169 | ||
− | + | == Agenda == | |
− | Agenda | + | * Covid-19 https://www.nature.com/articles/d41586-020-01221-y?utm_source=pocket-newtab https://www.virginia.gov/coronavirus/ |
− | + | * Jlab Update - [[Media:Accelerator return plan.pdf]] | |
− | + | * Time Charges - If there is work for you to do and you are not doing it (besides things related to shutdown of schools etc..), charge sick or vacation | |
− | + | * On Call Activity -- Tim https://logbooks.jlab.org/book/hdlog | |
− | + | * Updates | |
− | + | ** Tim -- CPP Design and Analysis, FCAL 2 cooling analysis, writing and Engineering systems Training, P&ID, training | |
− | + | ** Mark -- Return planning , Log entries, Daily Virtual walktrough, training | |
− | + | ** Scot -- SAD schedule, training, Gas system P&ID | |
− | + | ** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc.... | |
− | + | ** Stephanie -- CPP Redesign for alignment, CAD | |
− | + | ** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | |
− | + | ** Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID | |
− | + | ** Chris -- Welding, Training | |
− | + | ** Nick -- power supply temp/Flow readings | |
− | + | * Help desk still live -- 269-7155 | |
− | + | * Service now for issues - https://jlab.servicenowservices.com/nav_to.do?uri=%2Fhome.do%3F | |
− | + | * Daily work | |
− | + | ** Send a daily check in email response to the group | |
− | + | ** Complete any training that is due within the next 4 months | |
− | + | ** Update documentation you are responsible for and are able to do from home | |
− | + | ** Familiarize with Bluejeans and attend meetings as required | |
− | + | ** Check Web EDM (CSS) screens periodically (daily) | |
− | + | ** Check HDLOG daily and respond as needed. | |
− | + | ** All must be available during working hours | |
− | + | ** If you are going out of town, notify supervisor and charge vacation | |
− | + | ** If you are sick, charge sick time | |
− | + | ** Charge HDOPS for the actual time spent on above activities | |
− | + | ** Charge Public Health Emergency for the remainder of hours up to 8 per day max. | |
− | + | ** Fill out timesheets daily | |
− | + | * Anything else? | |
− | + | ||
− | + |
Latest revision as of 07:38, 1 May 2020
Meeting Time and Place
Friday May 1, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Agenda
- Covid-19 https://www.nature.com/articles/d41586-020-01221-y?utm_source=pocket-newtab https://www.virginia.gov/coronavirus/
- Jlab Update - Media:Accelerator return plan.pdf
- Time Charges - If there is work for you to do and you are not doing it (besides things related to shutdown of schools etc..), charge sick or vacation
- On Call Activity -- Tim https://logbooks.jlab.org/book/hdlog
- Updates
- Tim -- CPP Design and Analysis, FCAL 2 cooling analysis, writing and Engineering systems Training, P&ID, training
- Mark -- Return planning , Log entries, Daily Virtual walktrough, training
- Scot -- SAD schedule, training, Gas system P&ID
- Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
- Chris -- Welding, Training
- Nick -- power supply temp/Flow readings
- Help desk still live -- 269-7155
- Service now for issues - https://jlab.servicenowservices.com/nav_to.do?uri=%2Fhome.do%3F
- Daily work
- Send a daily check in email response to the group
- Complete any training that is due within the next 4 months
- Update documentation you are responsible for and are able to do from home
- Familiarize with Bluejeans and attend meetings as required
- Check Web EDM (CSS) screens periodically (daily)
- Check HDLOG daily and respond as needed.
- All must be available during working hours
- If you are going out of town, notify supervisor and charge vacation
- If you are sick, charge sick time
- Charge HDOPS for the actual time spent on above activities
- Charge Public Health Emergency for the remainder of hours up to 8 per day max.
- Fill out timesheets daily
- Anything else?