Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, March 16)
(Monday, March 16)
Line 42: Line 42:
 
#** [https://logbooks.jlab.org/entry/3804017 gradual recovery within 23 hours]
 
#** [https://logbooks.jlab.org/entry/3804017 gradual recovery within 23 hours]
 
# Reports/Issues
 
# Reports/Issues
 +
#* [https://logbooks.jlab.org/entry/3804728 strange pattern in fdc occupancy] -- Alexander
 
#* [https://logbooks.jlab.org/entry/3803258 fadc250 data corruption issue?] -- Beni
 
#* [https://logbooks.jlab.org/entry/3803258 fadc250 data corruption issue?] -- Beni
 
#** [https://logbooks.jlab.org/entry/3804492 problem narrowed down to one fadc250 module]
 
#** [https://logbooks.jlab.org/entry/3804492 problem narrowed down to one fadc250 module]

Revision as of 08:44, 16 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!