Difference between revisions of "Feb 6, 2020 Calorimeter"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 29: | Line 29: | ||
= Action Items = | = Action Items = | ||
− | # Ship back bases to IU that fail repair (Colin) | + | # <strike> Ship back bases to IU that fail repair (Colin) </strike> Bases left in shipping by Elton. Need to check that package was actually shipped . |
− | # Check that the 4ns shifts in the BCAL FADCs is absent with the new firmware (Mark) | + | # <strike> Check that the 4ns shifts in the BCAL FADCs is absent with the new firmware (Mark) </strike> No issues seen, but will check during normal calibrations |
# Complete [https://halldweb.jlab.org/wiki-private/index.php/2018_Work_Packages#Calorimetry Calorimeter work packages] | # Complete [https://halldweb.jlab.org/wiki-private/index.php/2018_Work_Packages#Calorimetry Calorimeter work packages] | ||
Line 54: | Line 54: | ||
= Minutes = | = Minutes = | ||
− | ''Attending: | + | ''Attending: Elton, Colin, Mark (JLab); Karthik, Varun, Zisis (UofR); Sean (FSU); Curtis (CMU); Matt (IU). |
+ | |||
+ | # Announcements | ||
+ | #* [[GlueX-Collaboration-Feb-2020|Collaboration Meeting]] February 13-15, 2020. | ||
+ | #* Announcement at Production and Analysis meeting. Complete calibrations by April 1? See [https://halldweb.jlab.org/wiki/index.php/2020_Data_Production 2020 Data Production] | ||
+ | # Action Items | ||
+ | # Run Updates | ||
+ | ## FCAL | ||
+ | ## BCAL | ||
+ | # Calibrations | ||
+ | ## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4322 Toy MC to study non-linearities slides] (Elton). See also [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4321 GlueX-doc-4321] | ||
+ | # Monitoring | ||
+ | # Reconstruction | ||
+ | # Efficiencies | ||
+ | # Simulations | ||
+ | # NIM articles | ||
+ | # Any other business |
Revision as of 13:00, 6 February 2020
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Contents
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
References
- FCAL HDFCAL log book
- BCAL HDBCAL log book
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
- Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.
Action Items
-
Ship back bases to IU that fail repair (Colin)Bases left in shipping by Elton. Need to check that package was actually shipped . -
Check that the 4ns shifts in the BCAL FADCs is absent with the new firmware (Mark)No issues seen, but will check during normal calibrations - Complete Calorimeter work packages
Tentative Agenda
- Announcements
- Collaboration Meeting February 13-15, 2020.
- Announcement at Production and Analysis meeting. Complete calibrations by April 1? See 2020 Data Production
- Action Items
- Run Updates
- FCAL
- BCAL
- Calibrations
- Toy MC to study non-linearities slides (Elton). See also GlueX-doc-4321
- Monitoring
- Reconstruction
- Efficiencies
- Simulations
- NIM articles
- Any other business
Minutes
Attending: Elton, Colin, Mark (JLab); Karthik, Varun, Zisis (UofR); Sean (FSU); Curtis (CMU); Matt (IU).
- Announcements
- Collaboration Meeting February 13-15, 2020.
- Announcement at Production and Analysis meeting. Complete calibrations by April 1? See 2020 Data Production
- Action Items
- Run Updates
- FCAL
- BCAL
- Calibrations
- Toy MC to study non-linearities slides (Elton). See also GlueX-doc-4321
- Monitoring
- Reconstruction
- Efficiencies
- Simulations
- NIM articles
- Any other business