** Initial data reconstruction underway: | ** Initial data reconstruction underway: | ||
*** REST, histogram and tree files appearing at: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver00 | *** REST, histogram and tree files appearing at: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver00 | ||
− | * Unfortunate data loss before accelerator vacuum issue: Run 70850-70895 | + | * Unfortunate data loss before accelerator vacuum issue: Run 70850-70895: https://logbooks.jlab.org/entry/3750309 |
* LED Analysis: (Ahmed/Bill/Andrew) | * LED Analysis: (Ahmed/Bill/Andrew) | ||
* Upcoming plans: | * Upcoming plans: |
Revision as of 11:09, 10 December 2019
Contents
Meeting Information
GlueX DIRC Meeting
Tuesdays and Thursdays, December 3-19
10:00 am, EDT
Hall D Counting House
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Useful Links:
Tuesday, December 10
- First field-on data Friday evening: Run 70817+
- Initial issues with timing now resolved and data processing some plots
- Initial data reconstruction underway:
- REST, histogram and tree files appearing at: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver00
- Unfortunate data loss before accelerator vacuum issue: Run 70850-70895: https://logbooks.jlab.org/entry/3750309
- LED Analysis: (Ahmed/Bill/Andrew)
- Upcoming plans:
- When beam is back continue with nominal conditions: Threshold = pedestal + 100, equalized gains, HV = 1000 V
- Dedicated runs with GEM detector included with low trigger rate
Thursday, December 5
- Collected straight track data in "beam left" position: see correlations with TRD wire chamber and GEM SRS (APV) modules
- A couple runs with DIRC included for initial tests (70720 and 70721)
- LED Analysis: (Ahmed/Bill)
- Upcoming plans:
- Today/tonight: Straight track data in center and right positions by Friday morning.
- Friday: Ramp solenoid and setup for DIRC commissioning
- Weekend: DIRC commissioning with full solenoid field!
Tuesday, December 3
- Status update from the Hall
- Plans for straight track data