Difference between revisions of "October 28, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 25: Line 25:
 
# LED diffuser Update (Bill)
 
# LED diffuser Update (Bill)
 
# Readout tests (Justin, Bill, All)
 
# Readout tests (Justin, Bill, All)
 +
#* [https://logbooks.jlab.org/entry/3734898 Successful FPGA replacement] (Bill, Justin)
 +
#* [https://logbooks.jlab.org/entry/3734904 Threshold scan of North and South OB (Run 70005) for LED runs] (Justin, Bill)
 
#* [https://logbooks.jlab.org/entry/3735666 First tests of North and South OB with pulser and LED] (Justin, Bill)  
 
#* [https://logbooks.jlab.org/entry/3735666 First tests of North and South OB with pulser and LED] (Justin, Bill)  
#** Successful FPGA replacement (Bill, Justin)
 
 
# [[Fall 2019 DIRC Commissioning|Fall 2019 Run Plan]] (All)
 
# [[Fall 2019 DIRC Commissioning|Fall 2019 Run Plan]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)

Revision as of 22:24, 27 October 2019

Meeting Information

GlueX DIRC Meeting
Monday October 14, 2019
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Mirror replacement update
    • Full size gluing samples and water test (Tim, Keith)
      • Thermal expansion test #3 Result
    • Mirror cutting complete (Tim)
    • Expect borosilicate delivery on Tuesday (Tim)
    • Gluing procedure and plan (All)
  3. LED diffuser Update (Bill)
  4. Readout tests (Justin, Bill, All)
  5. Fall 2019 Run Plan (All)
  6. Spring 2019 DIRC Commissioning Analysis (All)
    • New production announcement e-mail
      • Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
    • New simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  7. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  8. Software overview and tasks (All)
  9. AOB