Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"
From GlueXWiki
m |
m |
||
Line 30: | Line 30: | ||
#* Production running, 200nA, 10<sup>-4</sup> Al | #* Production running, 200nA, 10<sup>-4</sup> Al | ||
#* End of run in two weeks time... | #* End of run in two weeks time... | ||
+ | #* AOB | ||
== Monday, Apr. 1 at 08:45 == | == Monday, Apr. 1 at 08:45 == |
Revision as of 08:30, 2 April 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Tuesday, Apr. 2 at 08:45
- Notes from the past 24 hours
- Issues
- Beam position excursions Owl shift
- Identical tagger plots in monitoring
- HD-01 key rubber
- Gluon 04 prompting for installation of updates
- Reports
- Today
- Possible RF recovery work
- Refill target
- Harp scan
- Possible raster scan and active collimator calibration
- Run Plan
- Production running, 200nA, 10-4 Al
- End of run in two weeks time...
- AOB
Monday, Apr. 1 at 08:45
- Notes from the weekend
- Solenoid turbo pump [4][5]
- Orbit and separator adjustments
- North Linac turbo pump
- Issues
- Reports
- Today
- Beam studies/RF recovery merged into today
- Switch to Empty target
- Run Plan
- When beam resumes, harp scans, then production running on empty target, 200nA, 10-4 Al
- Tuesday, RF recovery may not happen. Refill target
- End of run in two weeks time...
- AOB
Sunday, Mar. 31 - No Meeting
Saturday, Mar. 30 - No Meeting
Friday, Mar. 29 at 08:45
- Past 24 hours:
- North Linac problems day shift into swing (~3 hours)
- 4th pass separator, expect issues to continue for the next couple of shifts
- DAQ crash swing shift
- DAQ crash owl shift
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Accesses(?)
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?
- End of run is coming...
Thursday, Mar. 28 at 08:45
- Past 24 hours:
- Pass change for hall C
- Separator issues, 4th and 5th pass
- Minor drifts in the Active Collimator lock
- Minor drifts in beam current
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Short interruption by MCC to continue investigation of separator issues from last night
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?