#*** Flow water through full system and establish controls, N2 purge, etc. | #*** Flow water through full system and establish controls, N2 purge, etc. | ||
# Mirror box laser alignment | # Mirror box laser alignment | ||
− | #* Update on geometry and laser projections (Bill) | + | #* Update on [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf geometry and laser projections], utilize Optical Box cradle (Bill/Stephanie) |
# Cabling and DAQ integration | # Cabling and DAQ integration | ||
#* Cabling progressing (Tim, Fernando) | #* Cabling progressing (Tim, Fernando) |
Revision as of 06:30, 9 August 2018
Meeting Information
GlueX DIRC Analysis Meeting
Thursday August 9, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Fall semester: Doodle poll
- Optical box
- Fabrication status update (Ernie and Jason)
- Component QA and assembly status at Bates
- Quartz window flange modification
- Delivery of back plate from Lesker (August 8?)
- Mirror cutting and installation
- Dark box design (Jason)
- PMT test fixture and cookies (Maria)
- Fabrication status update (Ernie and Jason)
- Installation schedule discussion:
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Ernie to deliver on Sunday evening, August 12
- Packing list from Bates (Jason)
- Goals:
- Test water tightness of optical box and interface with bar boxes
- Flow water through full system and establish controls, N2 purge, etc.
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Mirror box laser alignment
- Update on geometry and laser projections, utilize Optical Box cradle (Bill/Stephanie)
- Cabling and DAQ integration
- Cabling progressing (Tim, Fernando)
- Sasha successfully read out SSP in DIRC crate with production DAQ, next install FPGA module for further testing
- When data available from FPGA, EVIO parser can be written and translation table developed
- Simulation studies (Maria and Roman)
- Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie, Maria)
- Documentation of LUT algorithm by Maria
- Implementation of reconstruction in halld_recon library underway (Justin)
- MAPMT testing (Bill and Andrew)
- Magnetic field tests underway this week
- Commissioning plans
- Reminder: Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)
- AOB