Difference between revisions of "BLTWG Meeting 6/26/2008"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 7: | Line 7: | ||
# [http://www.jlab.org/~somov/cave_bg/note_cave_bg.pdf Status on the collimator cave background studies] - ''Alex'' | # [http://www.jlab.org/~somov/cave_bg/note_cave_bg.pdf Status on the collimator cave background studies] - ''Alex'' | ||
# [http://zeus.phys.uconn.edu/halld/bltwghome/UConn-Jlab_contract-7-2007/milestone-6-2008/report-6-2008.pdf Status report on tagger microscope prototyping] - ''R. Jones'' | # [http://zeus.phys.uconn.edu/halld/bltwghome/UConn-Jlab_contract-7-2007/milestone-6-2008/report-6-2008.pdf Status report on tagger microscope prototyping] - ''R. Jones'' | ||
+ | # Discussion: strategy for beam tests in Hall B - ''R. Jones'' | ||
+ | # Agreement for diamond R&D - ''R. Jones, E. Aschenauer'' |
Revision as of 10:02, 26 June 2008
- Time: 10:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present:
Agenda
- Status on the collimator cave background studies - Alex
- Status report on tagger microscope prototyping - R. Jones
- Discussion: strategy for beam tests in Hall B - R. Jones
- Agreement for diamond R&D - R. Jones, E. Aschenauer