Line 17: | Line 17: | ||
# Announcement | # Announcement | ||
+ | #* [https://twitter.com/GlueX_DIRC/status/1004434383661608960 2 bar boxes installed] | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
− | |||
# Controls followup (Nick) | # Controls followup (Nick) | ||
#* [[File:DIRC Controls 6718.pdf]] | #* [[File:DIRC Controls 6718.pdf]] | ||
Line 25: | Line 25: | ||
#** Box production at Lesker: report from visit | #** Box production at Lesker: report from visit | ||
#** PMT test fixture: Assembly procedure and discussion | #** PMT test fixture: Assembly procedure and discussion | ||
− | #** Window | + | #** Window delivery schedule |
#** [https://halldweb.jlab.org/wiki/images/3/33/20180606_Dark_Box_Concept.pdf Dark box conceptual design] | #** [https://halldweb.jlab.org/wiki/images/3/33/20180606_Dark_Box_Concept.pdf Dark box conceptual design] | ||
+ | #** Mirror procurement, cutting and assembly | ||
#** Other items and quotes | #** Other items and quotes | ||
# Installation of optical box in Hall D | # Installation of optical box in Hall D | ||
− | #* Discussion of installation [ | + | #* Discussion of installation [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] (Tim, et al) |
# Discussion of assembly procedure and timeline: | # Discussion of assembly procedure and timeline: | ||
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D] | #* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D] |
Latest revision as of 15:55, 13 June 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday June 7, 2018
10:00 am, EDT
JLab A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Controls followup (Nick)
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: report from visit
- PMT test fixture: Assembly procedure and discussion
- Window delivery schedule
- Dark box conceptual design
- Mirror procurement, cutting and assembly
- Other items and quotes
- Status update (Ernie and Jason)
- Installation of optical box in Hall D
- Discussion of installation DIRC installation schedule (Tim, et al)
- Discussion of assembly procedure and timeline:
- AOB