Difference between revisions of "Controls Meeting 14-Sep-2017"
From GlueXWiki
Line 7: | Line 7: | ||
* Goni survey (Tim, Hovanes) | * Goni survey (Tim, Hovanes) | ||
* NBX upgrade (Brian) | * NBX upgrade (Brian) | ||
+ | * DIRC water system controls (Nick) | ||
* Other topics | * Other topics | ||
** FDC/CDC voltage EPICS IOC | ** FDC/CDC voltage EPICS IOC |
Revision as of 07:53, 12 September 2017
- Announcements
- Solenoid status (Tim,Beni)
- UPS test
- solenoid cool down
- Muon detector requirements for December (Elton)
- FDC/CDC gas control mods (Nick,Beni)
- Goni survey (Tim, Hovanes)
- NBX upgrade (Brian)
- DIRC water system controls (Nick)
- Other topics
- FDC/CDC voltage EPICS IOC
Time/Location
10:00AM Thursday 14-Sep-2017 CC B101