Difference between revisions of "April 3, 2017"

From GlueXWiki
Jump to: navigation, search
(Created page with "* ''' Loose end from the Spring 2017 run''' :: Final check of the fadc250 firmware ::: - Installed on all fadc crates :: F1TDC initialization issues (32 ns time shift) :: Und...")
 
Line 4: Line 4:
 
:: F1TDC initialization issues (32 ns time shift)
 
:: F1TDC initialization issues (32 ns time shift)
 
:: Understanding performance at high rate  
 
:: Understanding performance at high rate  
::: - busy distribution (possible crashes at high rate)
+
::: - busy distribution (possible crashes at high data rate)
 
::: - performance of CAEN TDCs
 
::: - performance of CAEN TDCs
  

Revision as of 09:46, 3 April 2017

  • Loose end from the Spring 2017 run
Final check of the fadc250 firmware
- Installed on all fadc crates
F1TDC initialization issues (32 ns time shift)
Understanding performance at high rate
- busy distribution (possible crashes at high data rate)
- performance of CAEN TDCs


  • Some results from high-luminosity tests in Spring 2016
- Data rate - David
- L1 Trigger rate - Alex
  • Preparations for the new run
- Testing of rocfcal10 crate
(new version of the fadc250 control firmware with debug features, not yet installed)
- Initialization of F1 TDCs
- Check performance of the fa250
- new processing firmware C0C0 installed
(minor corrections for processing pulses in the beginning of the readout window and setting integral quality bit)
- fadc250 processing doc updated
- Check bad fadc250 module in TOF