Difference between revisions of "Run Planning Meeting Notes, Mar 9 - Mar 15, 2017"
From GlueXWiki
(→Thursday, March 9) |
(→Wednesday, March 15) |
||
(29 intermediate revisions by 3 users not shown) | |||
Line 8: | Line 8: | ||
{|border | {|border | ||
|- | |- | ||
− | |width="50" | + | |width="50" align="center"| Shift |
− | |width="50" | + | |width="50" align="center"| ABU |
− | |width="50" | + | |width="50" align="center"| BNA |
− | |width="50" | + | |width="50" align="center"| BANU |
|- | |- | ||
− | |Day ||align="center"| 0:40 || 7:18 || 0:02 | + | |Day ||align="center"| 0:40 ||align="center"| 7:18 ||align="center"| 0:02 |
|- | |- | ||
− | |Swing || 0:0 || 8:0 || 0.0 | + | |Swing ||align="center"| 0:0 ||align="center"| 8:0 ||align="center"| 0.0 |
|- | |- | ||
− | |Owl || 0:24 || 6:55 || 0:41 | + | |Owl ||align="center"| 0:24 ||align="center"| 6:55 ||align="center"| 0:41 |
|- | |- | ||
− | |Total || 1:04 || 22:13 || 0:43 | + | |Total ||align="center"| 1:04 ||align="center"| 22:13 ||align="center"| 0:43 |
|- | |- | ||
|} | |} | ||
Line 34: | Line 34: | ||
#** Current Total: 40.05B | #** Current Total: 40.05B | ||
# Issues | # Issues | ||
− | |||
#* DAQ issues: | #* DAQ issues: | ||
#** 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes. | #** 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes. | ||
Line 50: | Line 49: | ||
{|border | {|border | ||
|- | |- | ||
− | + | |width="50" align="center"| Shift | |
+ | |width="50" align="center"| ABU | ||
+ | |width="50" align="center"| BNA | ||
+ | |width="50" align="center"| BANU | ||
|- | |- | ||
− | |Day || | + | |Day ||align="center"| 4:05 ||align="center"| 3:27 ||align="center"| 0:27 |
|- | |- | ||
− | |Swing || | + | |Swing ||align="center"| 5:26 ||align="center"| 2:32 ||align="center"| 0:02 |
|- | |- | ||
− | |Owl || 0: | + | |Owl ||align="center"| 0:0 ||align="center"| 8:0 ||align="center"| 0:0 |
|- | |- | ||
− | |Total || | + | |Total ||align="center"| 9:30 ||align="center"| 13:59 ||align="center"| 0:29 |
|- | |- | ||
|} | |} | ||
Line 64: | Line 66: | ||
# Accelerator Status over the last 24 hrs | # Accelerator Status over the last 24 hrs | ||
− | #* | + | #* beam delivery was fairly good (55%) until late evening |
− | #* | + | #* south linac cold box tripped around 22:30, 4hr recovery estimated |
− | #* | + | #* recovery was progressing, but tripped again around 03:30 |
− | # | + | #* MCC estimates Saturday morning at earliest |
− | # | + | # Progress with GlueX program in last 24 hours |
− | # | + | #* Low-intensity production started at 10:00 |
− | #** | + | #** 1e-4rl amorphous radiator @ 100uA : [https://logbooks.jlab.org/entry/3467007 trigger rates] |
− | #** | + | #*** 7kHz physics triggers (BCAL + FCAL) : 200M collected |
− | # | + | #*** 11kHz minimum-bias triggers (TAGM * ST) : 330M collected |
− | + | # Beam quality checks | |
− | #* | + | #* [https://logbooks.jlab.org/entry/3466802 analysis of harp scans] |
− | #* | + | #* [https://logbooks.jlab.org/entry/3466816 MO drift measurements] |
− | #** | + | #* [https://logbooks.jlab.org/entry/3466914 beam stability] |
+ | # Data quality checks | ||
+ | #* monitoring plots now showing up reliably | ||
+ | #* now running fADC250 in compressed mode | ||
+ | #* [https://logbooks.jlab.org/entry/3466869 new "enhancement" in TAGH occupancy] | ||
+ | # Record keeping quality | ||
+ | #* confusion about gas supply entries in shift checklist | ||
+ | #* "no" on to-do checklist items (EPICS screenshot logged) | ||
+ | # Special runs planned for next week | ||
+ | #* TAC run (8 hrs) | ||
+ | #* long mode (10 min.) | ||
+ | #* DAQ team wants to do some measurements (non-invasive) | ||
+ | #* level-3 tests | ||
+ | #* FDC HV test | ||
# Monitoring | # Monitoring | ||
#* low-level report | #* low-level report | ||
− | # Run | + | # Run plan for over the weekend |
− | #* | + | #* Standard production with diamond/amo run sequence |
− | # | + | # Offline Analysis |
+ | # Possible program at 5.5 GeV | ||
+ | ## Straight tracks (solenoid off) 10h, 8h ramp down | ||
+ | ## TAC measurements 8h | ||
+ | ## FDC HV & threshold scan 2h | ||
+ | ## DAQ high luminosity 4h | ||
+ | ## 20µm Diamond alignment 8h+16h | ||
+ | ## AC raster calibration 4h+4h | ||
+ | ## L1 high intensity test 8h | ||
+ | ## L3 high intensity test 4h | ||
+ | ## TOF new base test 2h (or parasitic with other measurements) | ||
+ | ## Study rates for TOF trigger for CPP experiment 4h | ||
+ | # AOB | ||
+ | |||
+ | ==Monday, March 13 == | ||
+ | {|border | ||
+ | |- | ||
+ | |width="50" align="center"| Shift | ||
+ | |width="50" align="center"| ABU | ||
+ | |width="50" align="center"| BNA | ||
+ | |width="50" align="center"| BANU | ||
+ | |- | ||
+ | |Day ||align="center"| 0:00 ||align="center"| 8:00 ||align="center"| 0:00 | ||
+ | |- | ||
+ | |Swing ||align="center"| 0:00 ||align="center"| 8:00 ||align="center"| 0:00 | ||
+ | |- | ||
+ | |Owl ||align="center"| 0:00 ||align="center"| 8:00 ||align="center"| 0:00 | ||
+ | |- | ||
+ | |Total ||align="center"| 0:00 ||align="center"| 24:00 ||align="center"| 0:00 | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | |||
+ | # Accelerator Status | ||
+ | #* [https://logbooks.jlab.org/entry/3467275 CHL suffered a "hard landing" during second cold box trip on 3/10] | ||
+ | #* report from the 8:00 meeting in MCC | ||
+ | #* outlook for remainder of this run | ||
+ | # GlueX status | ||
+ | #* solenoid magent is OFF | ||
+ | #* one solenoid PS trip over weekend, reason unknown | ||
+ | #* cosmic triggers were collected over weekend (130M so far) | ||
+ | # Possible program at 5.5 GeV | ||
+ | ## Straight tracks (solenoid off) 10h, 8h ramp down | ||
+ | ## TAC measurements 8h | ||
+ | ## FDC HV & threshold scan 2h | ||
+ | ## DAQ high luminosity 4h | ||
+ | ## 20µm Diamond alignment 8h+16h | ||
+ | ## AC raster calibration 4h+4h | ||
+ | ## L1 high intensity test 8h | ||
+ | ## L3 high intensity test 4h | ||
+ | ## TOF new base test 2h (or parasitic with other measurements) | ||
+ | ## Study rates for TOF trigger for CPP experiment 4h | ||
+ | # Systematics studies | ||
+ | #* [https://logbooks.jlab.org/entry/3467344 collimator halo with pin-hole insert] | ||
+ | #* [https://logbooks.jlab.org/entry/3467378 PARA/PERP polarization offset from beam-collimator misalignment] | ||
+ | # Monitoring | ||
+ | # Offline Analysis | ||
+ | # AOB | ||
+ | |||
+ | == Wednesday, March 15 == | ||
+ | Totals for this past week | ||
+ | {|border | ||
+ | |- | ||
+ | |width="50" align="center"| Shift | ||
+ | |width="50" align="center"| ABU | ||
+ | |width="50" align="center"| BNA | ||
+ | |width="50" align="center"| BANU | ||
+ | |- | ||
+ | |Total ||align="center"| 10:34 ||align="center"| *** ||align="center"| 1:12 | ||
+ | |- | ||
+ | |} | ||
+ | # Accelerator Status | ||
+ | #* [https://logbooks.jlab.org/entry/3467275 CHL suffered a "hard landing" during second cold box trip on 3/10] | ||
+ | #* report from the 8:00 meeting in MCC | ||
+ | #* outlook for fall 2017 | ||
+ | # GlueX status | ||
+ | #* solenoid magent is OFF | ||
+ | #* cosmic triggers are being collected | ||
+ | # Conclusions from systematics studies | ||
+ | #* [https://logbooks.jlab.org/entry/3467344 collimator halo with pin-hole insert] | ||
+ | #* [https://logbooks.jlab.org/entry/3467516 PARA/PERP polarization offset from beam-collimator misalignment] | ||
+ | #* [https://logbooks.jlab.org/entry/3467614 BCAL charged track efficiency study] | ||
+ | # Monitoring | ||
# Offline Analysis | # Offline Analysis | ||
− | |||
# AOB | # AOB |
Latest revision as of 08:38, 15 March 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 9
Shift | ABU | BNA | BANU |
Day | 0:40 | 7:18 | 0:02 |
Swing | 0:0 | 8:0 | 0.0 |
Owl | 0:24 | 6:55 | 0:41 |
Total | 1:04 | 22:13 | 0:43 |
- Accelerator Status over the last 24 hrs
- Accelerator busy with Hall C until 05:00
- Hall D first given beam at 05:20
- Data collection at 50nA started at 08:00
- Hall-D/GlueX items
- In the last 24 hours:
- Low-intensity production started at 08:00
- Long mode run (10 minutes) done at
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- DAQ issues:
- Monitoring
- low-level report
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB
Friday, March 10
Shift | ABU | BNA | BANU |
Day | 4:05 | 3:27 | 0:27 |
Swing | 5:26 | 2:32 | 0:02 |
Owl | 0:0 | 8:0 | 0:0 |
Total | 9:30 | 13:59 | 0:29 |
- Accelerator Status over the last 24 hrs
- beam delivery was fairly good (55%) until late evening
- south linac cold box tripped around 22:30, 4hr recovery estimated
- recovery was progressing, but tripped again around 03:30
- MCC estimates Saturday morning at earliest
- Progress with GlueX program in last 24 hours
- Low-intensity production started at 10:00
- 1e-4rl amorphous radiator @ 100uA : trigger rates
- 7kHz physics triggers (BCAL + FCAL) : 200M collected
- 11kHz minimum-bias triggers (TAGM * ST) : 330M collected
- 1e-4rl amorphous radiator @ 100uA : trigger rates
- Low-intensity production started at 10:00
- Beam quality checks
- Data quality checks
- monitoring plots now showing up reliably
- now running fADC250 in compressed mode
- new "enhancement" in TAGH occupancy
- Record keeping quality
- confusion about gas supply entries in shift checklist
- "no" on to-do checklist items (EPICS screenshot logged)
- Special runs planned for next week
- TAC run (8 hrs)
- long mode (10 min.)
- DAQ team wants to do some measurements (non-invasive)
- level-3 tests
- FDC HV test
- Monitoring
- low-level report
- Run plan for over the weekend
- Standard production with diamond/amo run sequence
- Offline Analysis
- Possible program at 5.5 GeV
- Straight tracks (solenoid off) 10h, 8h ramp down
- TAC measurements 8h
- FDC HV & threshold scan 2h
- DAQ high luminosity 4h
- 20µm Diamond alignment 8h+16h
- AC raster calibration 4h+4h
- L1 high intensity test 8h
- L3 high intensity test 4h
- TOF new base test 2h (or parasitic with other measurements)
- Study rates for TOF trigger for CPP experiment 4h
- AOB
Monday, March 13
Shift | ABU | BNA | BANU |
Day | 0:00 | 8:00 | 0:00 |
Swing | 0:00 | 8:00 | 0:00 |
Owl | 0:00 | 8:00 | 0:00 |
Total | 0:00 | 24:00 | 0:00 |
- Accelerator Status
- CHL suffered a "hard landing" during second cold box trip on 3/10
- report from the 8:00 meeting in MCC
- outlook for remainder of this run
- GlueX status
- solenoid magent is OFF
- one solenoid PS trip over weekend, reason unknown
- cosmic triggers were collected over weekend (130M so far)
- Possible program at 5.5 GeV
- Straight tracks (solenoid off) 10h, 8h ramp down
- TAC measurements 8h
- FDC HV & threshold scan 2h
- DAQ high luminosity 4h
- 20µm Diamond alignment 8h+16h
- AC raster calibration 4h+4h
- L1 high intensity test 8h
- L3 high intensity test 4h
- TOF new base test 2h (or parasitic with other measurements)
- Study rates for TOF trigger for CPP experiment 4h
- Systematics studies
- Monitoring
- Offline Analysis
- AOB
Wednesday, March 15
Totals for this past week
Shift | ABU | BNA | BANU |
Total | 10:34 | *** | 1:12 |
- Accelerator Status
- CHL suffered a "hard landing" during second cold box trip on 3/10
- report from the 8:00 meeting in MCC
- outlook for fall 2017
- GlueX status
- solenoid magent is OFF
- cosmic triggers are being collected
- Conclusions from systematics studies
- Monitoring
- Offline Analysis
- AOB