Difference between revisions of "Run Planning Meeting Notes, Mar 2 - Mar 8, 2017"

From GlueXWiki
Jump to: navigation, search
(Friday, March 3)
(Friday, March 3)
Line 58: Line 58:
 
#* 1630 - Beam back  
 
#* 1630 - Beam back  
 
#* 1730 - Attempt at trigger & DAQ studies
 
#* 1730 - Attempt at trigger & DAQ studies
 +
#** 1800 to 1840 - ACC access to replace controller
 +
#** 1900 to 1930 - FSD Card swap
 
#* 2000 - Start of production
 
#* 2000 - Start of production
#* Strip charts:
+
#** 500 - 20 min down due to
 +
#* Strip charts: [https://logbooks.jlab.org/entry/3464394 1]
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#* Harp scans:  [https://logbooks.jlab.org/entry/3464169 Accel.], [https://logbooks.jlab.org/entry/3464184 Hall D], [https://logbooks.jlab.org/entry/3464277 Hovanes analysis]
 
#* Harp scans:  [https://logbooks.jlab.org/entry/3464169 Accel.], [https://logbooks.jlab.org/entry/3464184 Hall D], [https://logbooks.jlab.org/entry/3464277 Hovanes analysis]
Line 65: Line 68:
 
#* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton)
 
#* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton)
 
#* In the last 24 hours:  
 
#* In the last 24 hours:  
#** Total triggers collected during last period: M
+
#** Total triggers collected during last period: [r30920+] M
 
#** Run Statistics [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1113040681 Spread Sheet]
 
#** Run Statistics [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1113040681 Spread Sheet]
 
#** Current Total: B
 
#** Current Total: B
 
# Issues
 
# Issues
 
#* Red lines on run control GUI?
 
#* Red lines on run control GUI?
 +
#* Front-panel triggers off for 30920-2
 +
#* Firefox problems
 
# Monitoring
 
# Monitoring
 
#* [https://logbooks.jlab.org/entry/ low-level report]
 
#* [https://logbooks.jlab.org/entry/ low-level report]

Revision as of 07:12, 3 March 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, March 2

Shift ABU BNA BANU
Day 6.49 0.63 0.88
Swing 6.97 0.32 0.71
Owl 7.09 0.11 0.80
Total 20.55 1.06 2.39


  1. Accelerator Status over the last 24 hrs
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Production data taken after 10:30 AM Weds.
      • Long mode run
      • Black spots on diamonds
      • Total triggers collected during last period: 3099M
      • Run Statistics Spread Sheet
      • Current Total: 40.05B
  3. Issues
    • Problems with FCAL crate 9
    • FCAL red light issue
    • TRD gas issue
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  4. Monitoring
  5. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  6. Offline Analysis
    • TAC runs?
  7. AOB

Friday, March 3

  1. Accelerator Status over the last 24 hrs
    • Vacuum issues [~6 hours down]
    • 1630 - Beam back
    • 1730 - Attempt at trigger & DAQ studies
      • 1800 to 1840 - ACC access to replace controller
      • 1900 to 1930 - FSD Card swap
    • 2000 - Start of production
      • 500 - 20 min down due to
    • Strip charts: 1
  2. Hall-D/GlueX items
  3. Issues
    • Red lines on run control GUI?
    • Front-panel triggers off for 30920-2
    • Firefox problems
  4. Monitoring
  5. Run Plan
    • Production
    • Tagger/SC trigger
    • fADC250 Compressed Mode?
    • Next week:
      • High rate run [500 nA]
      • Low rate run [50 nA + 2x10^-5 RL Al]
  6. Offline Analysis
    • TAC runs?
  7. AOB