Difference between revisions of "Planning for 2015 DIRC Review"
From GlueXWiki
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
(39 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
== Meeting Information == | == Meeting Information == | ||
− | GlueX DIRC Review Meeting | + | GlueX DIRC Review Meeting |
− | October, 2015 | + | October, 14 2015 |
+ | Review Committee: | ||
+ | *Thomas K. Hemmick (Chair) Stony Brook University | ||
+ | *Clara Matteuzzi INFN Milano Bicocca | ||
+ | *Marco Contalbrigo INFN Ferrara | ||
+ | *Jerry Va'vra SLAC | ||
+ | *Allison Lung Jefferson Lab | ||
+ | *David Abbott Jefferson Lab | ||
+ | *Javier Gomez Jefferson Lab | ||
+ | *Tim Whitlatch Jefferson Lab | ||
+ | |||
+ | DOE Observers: | ||
+ | *Gulshan Rai DOE/SC | ||
+ | *Jehanne Gillo DOE/SC | ||
+ | *Elizabeth Bartosz DOE/SC | ||
+ | |||
+ | [https://halldweb1.jlab.org/wiki/images/3/35/DIRC_review_CHARGE.pdf Review Charge] | ||
+ | |||
+ | == Preliminary Agenda == | ||
+ | |||
+ | *8:00 - 8:30 Executive Session | ||
+ | *8:30 - 9:30 (40 + 20) Introduction and Project Overview (Curtis) | ||
+ | ** Meson spectroscopy introduction with focus on strange final states | ||
+ | ** Kaon ID limitations with baseline GlueX and improvements with DIRC | ||
+ | ** Overview of GlueX run plan | ||
+ | ** Review of BaBar design and SLAC FDIRC prototype | ||
+ | ** General overview of design, referring to later talks for specifics | ||
+ | ** Summarize requirements for RICH MaPMT readout and show they're well matched to the DIRC (including DAQ/Trigger) | ||
+ | ** Evaluation of design based on John's simulation | ||
+ | *9:30 - 10:15 (30 + 15) Focusing Box Prototype Studies (Mike) | ||
+ | ** Overview of prototype design | ||
+ | ** John's test setup at Bates and mirror characterization | ||
+ | ** Plans for full scale box design | ||
+ | *10:15 - 10:45 Break | ||
+ | *10:45 - 11:30 (30 + 15) Mechanical Design, Integration and Transport (Matt) | ||
+ | ** Support structure design and integration with forward carriage | ||
+ | ** Reasoning for horizontal (instead of vertical) design | ||
+ | ** Shipping crate design and tests with accelerometers at IU on mock bar box | ||
+ | *11:30 - 12:30 (40 + 20) Project Management, Cost, and Schedule (Justin) | ||
+ | ** Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc. | ||
+ | *12:30 - 1:30 Lunch (Executive Session) | ||
+ | *1:30 - 4:00 Executive Session | ||
+ | *4:00 Closeout | ||
== TDR preparation schedule == | == TDR preparation schedule == | ||
− | * October | + | * October 14: External review at JLab |
− | * September | + | * October 7: Dry runs of talks at JLab |
− | * September | + | * September 30: Submit final TDR to external committee |
− | * | + | * September 23: Submit draft TDR to collaboration for review |
− | * August | + | * September 7: Receive feedback from internal committee's review of TDR |
− | * August | + | * August 28: Submit draft TDR to internal committee for review |
− | * | + | * August 14: Complete drafts of all TDR sections |
+ | * Early July: First draft of all TDR sections | ||
* Early June: Complete outline of TDR sections | * Early June: Complete outline of TDR sections | ||
− | |||
== Documents == | == Documents == | ||
* [https://halldsvn.jlab.org/repos/trunk/docs/GlueXdoc/dirc_tdr/ SVN repository for TDR] | * [https://halldsvn.jlab.org/repos/trunk/docs/GlueXdoc/dirc_tdr/ SVN repository for TDR] | ||
* Eventually will link to relevant document(s) on DocDB | * Eventually will link to relevant document(s) on DocDB | ||
+ | ** LHCb Paper on Multianode PMT [http://arxiv.org/abs/1506.04302 arXiv]. | ||
* Talks for review in DocDB | * Talks for review in DocDB | ||
* etc. | * etc. | ||
+ | == Previous Documentation == | ||
+ | |||
+ | * Recent JLab PAC proposals: | ||
+ | ** PAC 39: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1962 DocDB] [http://arxiv.org/abs/1210.4508 arXiv] | ||
+ | ** PAC 40: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2198 DocDB] [http://arxiv.org/abs/1305.1523 arXiv] | ||
+ | ** PAC 42: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2505 DocDB] [http://arxiv.org/abs/1408.0215 arXiv] | ||
− | == | + | * Recent GlueX collaboration meeting talks: |
− | + | ** 2014: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2424 Winter] [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2499 Spring] [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2566 Fall] | |
+ | ** 2015: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2663 Winter] [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2728 Spring] |
Latest revision as of 17:13, 24 February 2017
Contents
Meeting Information
GlueX DIRC Review Meeting October, 14 2015
Review Committee:
- Thomas K. Hemmick (Chair) Stony Brook University
- Clara Matteuzzi INFN Milano Bicocca
- Marco Contalbrigo INFN Ferrara
- Jerry Va'vra SLAC
- Allison Lung Jefferson Lab
- David Abbott Jefferson Lab
- Javier Gomez Jefferson Lab
- Tim Whitlatch Jefferson Lab
DOE Observers:
- Gulshan Rai DOE/SC
- Jehanne Gillo DOE/SC
- Elizabeth Bartosz DOE/SC
Preliminary Agenda
- 8:00 - 8:30 Executive Session
- 8:30 - 9:30 (40 + 20) Introduction and Project Overview (Curtis)
- Meson spectroscopy introduction with focus on strange final states
- Kaon ID limitations with baseline GlueX and improvements with DIRC
- Overview of GlueX run plan
- Review of BaBar design and SLAC FDIRC prototype
- General overview of design, referring to later talks for specifics
- Summarize requirements for RICH MaPMT readout and show they're well matched to the DIRC (including DAQ/Trigger)
- Evaluation of design based on John's simulation
- 9:30 - 10:15 (30 + 15) Focusing Box Prototype Studies (Mike)
- Overview of prototype design
- John's test setup at Bates and mirror characterization
- Plans for full scale box design
- 10:15 - 10:45 Break
- 10:45 - 11:30 (30 + 15) Mechanical Design, Integration and Transport (Matt)
- Support structure design and integration with forward carriage
- Reasoning for horizontal (instead of vertical) design
- Shipping crate design and tests with accelerometers at IU on mock bar box
- 11:30 - 12:30 (40 + 20) Project Management, Cost, and Schedule (Justin)
- Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc.
- 12:30 - 1:30 Lunch (Executive Session)
- 1:30 - 4:00 Executive Session
- 4:00 Closeout
TDR preparation schedule
- October 14: External review at JLab
- October 7: Dry runs of talks at JLab
- September 30: Submit final TDR to external committee
- September 23: Submit draft TDR to collaboration for review
- September 7: Receive feedback from internal committee's review of TDR
- August 28: Submit draft TDR to internal committee for review
- August 14: Complete drafts of all TDR sections
- Early July: First draft of all TDR sections
- Early June: Complete outline of TDR sections
Documents
- SVN repository for TDR
- Eventually will link to relevant document(s) on DocDB
- LHCb Paper on Multianode PMT arXiv.
- Talks for review in DocDB
- etc.