Difference between revisions of "2015-04-15"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday April 15, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. ==...") |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 32: | Line 32: | ||
** Electronics Activities | ** Electronics Activities | ||
** Other Activities | ** Other Activities | ||
− | * Beamline Status [[ | + | * Beamline Status [[BTLWG Meeting 04/13/2015|April 13, 2015]] |
** Active Collimator | ** Active Collimator | ||
** Pair Spectrometer | ** Pair Spectrometer | ||
Line 40: | Line 40: | ||
** Polarimeter | ** Polarimeter | ||
* Start Counter [[GlueX Start Counter Meeting, March 19, 2015#Minutes|March 19, 2015]] | * Start Counter [[GlueX Start Counter Meeting, March 19, 2015#Minutes|March 19, 2015]] | ||
− | * Tracking [[Minutes- | + | * Tracking [[Minutes-4-9-2015|Joint FDC/CDC Meeting April 9, 2015]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | ** FADC FPGA [[ | + | ** FADC FPGA [[FA125_Update_April_14,_2015| FA125 update April 14, 2015]] |
− | * Calorimeters: [[ | + | * Calorimeters: [[Apr 9, 2015 Calorimetry| April 9, 2015]] |
** FCAL | ** FCAL | ||
** BCAL | ** BCAL | ||
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2015-03-19 | March 19, 2015]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2015-03-19 | March 19, 2015]] | ||
− | * TOF [[GlueX TOF Meeting, | + | * TOF [[GlueX TOF Meeting, April 7, 2015|April 7, 2015]] |
− | * Online Systems [[OWG Meeting | + | * Online Systems [[OWG Meeting 8-Apr-2015 |April 8, 2015]] |
** Level-1 Trigger Status | ** Level-1 Trigger Status | ||
** Controls | ** Controls | ||
** DAQ | ** DAQ | ||
** Monitoring | ** Monitoring | ||
− | * Offline Activities [[GlueX Offline Meeting, | + | * Offline Activities [[GlueX Offline Meeting, April 1, 2015|April 1, 2015]] |
** Software Status | ** Software Status | ||
** Data Challenge 3 | ** Data Challenge 3 | ||
** Offline Monitoring | ** Offline Monitoring | ||
− | ** Calibration [[ | + | ** Calibration [[April 8, 2015 Calibration| April 8, 2015]] - [[Calibration Dashboard]] |
− | * Physics Analysis [[ | + | * Physics Analysis [[April 6, 2015, Physics Working Group|April 6, 2015]] |
* | * | ||
=== Other Activities === | === Other Activities === | ||
− | * PID Upgrades [[ | + | * PID Upgrades [[April 2, 2015 PID Upgrade| April 2, 2015 PID Upgrade]] |
* Software (Level-3) [[September 2, 2014| September 2, 2014]] | * Software (Level-3) [[September 2, 2014| September 2, 2014]] | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2511 Technical Construction Report] |
* AOT | * AOT |
Latest revision as of 16:52, 24 February 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday April 15, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
- May 2015 Collaboration Meeting
- DIRC Review
Run Planning for Spring 2015
Detector Updates
- Engineering Activities
- Target
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status April 13, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter March 19, 2015
- Tracking Joint FDC/CDC Meeting April 9, 2015
- CDC
- FDC
- FADC FPGA FA125 update April 14, 2015
- Calorimeters: April 9, 2015
- FCAL
- BCAL
- BCAL Reconstruction March 19, 2015
- TOF April 7, 2015
- Online Systems April 8, 2015
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Activities April 1, 2015
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration April 8, 2015 - Calibration Dashboard
- Physics Analysis April 6, 2015
Other Activities
- PID Upgrades April 2, 2015 PID Upgrade
- Software (Level-3) September 2, 2014
- Technical Construction Report
- AOT