Line 32: | Line 32: | ||
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May) | - It will probably take 4 weeks for the GlueX Collaboration to review (April-May) | ||
− | - In March, we plan to ask Rolf for a technical review ( | + | - In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion) |
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL. | - GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL. | ||
− | 2) We have to make a conceptual design of the KL project which allows to estimate a | + | 2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it. |
− | cost of the KL. To do that we have to draw a Note and then ask Eugene to ask Tim to make it. | + | |
− | 3) | + | 3) Put the right LH2 target and beamline into GlueX MC. |
− | + | 4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc. | |
− | ds/dO | + | -- ds/dO for KLp-->K+n (Mikhail) |
− | + | -- ds/dO and Sigma for KLp-->K+Xi (Nick) | |
− | + | -- ds/dO for xxx ? | |
− | 6) etc | + | 5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target. |
+ | |||
+ | 6) Status of neutron background simulations (Igor) | ||
+ | |||
+ | 7) Schedule for the next meeting | ||
+ | |||
+ | 8) etc |
Revision as of 13:26, 29 November 2016
Meetings
We will use Blue Jeans for remote participation.
You can connect to the remote meeting via your browser: https://jlab.bluejeans.com/178535051/
Call-in Directions:
1. Dial: Primary Number: +1-408-740-7256 Toll free number: +1-888-240-2560
2. Enter meeting ID: 178535051
3. Press #
Meeting title: YSTAR2016
International phone numbers are listed on: http://bluejeans.com/numbers
- December 7, 2016 10-11 AM
The tentative agenda is
1) Our schedule for the proposal (back in time):
- We may expect that PAC will be scheduled for July.
- We have to submit our proposal 6 weeks in advance (May-June)
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May)
- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion)
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
3) Put the right LH2 target and beamline into GlueX MC.
4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
-- ds/dO for KLp-->K+n (Mikhail)
-- ds/dO and Sigma for KLp-->K+Xi (Nick)
-- ds/dO for xxx ?
5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.
6) Status of neutron background simulations (Igor)
7) Schedule for the next meeting