Difference between revisions of "July 15, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
|||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
# Optical box design update (MIT) | # Optical box design update (MIT) | ||
− | #* Test setups at ODU and CUA (Greg) | + | #* [https://userweb.jlab.org/~gkalicy/ODUandCUAsetups_Greg.pdf Test setups at ODU and CUA] (Greg) |
# Support structure design update (IU) | # Support structure design update (IU) | ||
# [[DIRC Planning for FY16|Planning for FY16]] | # [[DIRC Planning for FY16|Planning for FY16]] | ||
# AOB | # AOB |
Revision as of 09:41, 15 July 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, July 1, 2016
1 pm, EDT
JLab room F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box design update (MIT)
- Test setups at ODU and CUA (Greg)
- Support structure design update (IU)
- Planning for FY16
- AOB