Difference between revisions of "2016-05-25"
From GlueXWiki
(Created page with "== Meeting Time and Place == The meeting will be on Wednesday May 25, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == Meeting Co...") |
(→Analysis Activities) |
||
Line 28: | Line 28: | ||
* Analysis Working Group [[May 24, 2016, Analysis Working Group|May 24, 2016]] | * Analysis Working Group [[May 24, 2016, Analysis Working Group|May 24, 2016]] | ||
* Calibration [[May 18, 2016 Calibration| May 18, 2016]] - [[Calibration Dashboard]] | * Calibration [[May 18, 2016 Calibration| May 18, 2016]] - [[Calibration Dashboard]] | ||
− | * Physics Working Group[[April 18, 2016, Physics Working Group|April 18, 2016] | + | * Physics Working Group [[April 18, 2016, Physics Working Group|April 18, 2016]] |
=== Data Acquisition and Electronics Systems === | === Data Acquisition and Electronics Systems === |
Revision as of 15:38, 23 May 2016
Contents
Meeting Time and Place
The meeting will be on Wednesday May 25, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Nuclear Photoproduction with GlueX April 28-29
- Collaboration Meeting May 9-11
- The May Physics / Analysis Workshop after May Collaboration Meeting, May 11-13
- Solenoid Update
The Fall 2016 Run
Analysis Activities
- Offline Software April 13, 2016
- Analysis Working Group May 24, 2016
- Calibration May 18, 2016 - Calibration Dashboard
- Physics Working Group April 18, 2016
Data Acquisition and Electronics Systems
- Online Systems May 18, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status May 23, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter March 24, 2016
- Tracking May 19, 2016
- CDC
- FDC
- Calorimeters: May 19, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System April 22, 2016 PID Upgrade
Other Activities
- AOT