Difference between revisions of "April 22, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
+ | # [[GlueX-Collaboration-May-2016|Collaboration Meeting]] | ||
# Optical box design update (MIT): | # Optical box design update (MIT): | ||
#* [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5| Calibration]] | #* [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5| Calibration]] |
Latest revision as of 15:45, 21 April 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, April 22, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting
- Optical box design update (MIT):
- Bar box shipping (John and Matt)
- Support structure design update (IU)
- Planning for FY16
- AOB