(21 intermediate revisions by 2 users not shown) |
Line 1: |
Line 1: |
− | The main installation and trigger activities can be organized into the three main phases:
| + | [[Trigger Installation Activities | Trigger Installation Activities]] |
| | | |
− | : '''1. Initial installation phase, where only a few crates with electronics will be installed and connected to the sub-detector.''' | + | [https://halldweb1.jlab.org/level-1/algorithm/trigger_types.pdf Trigger Types (draft)] |
− | :* Run stand alone DAC for each sub-detector. Start calibration of fadc pedestals, implementing calibration triggers and start tuning trigger parameters
| + | |
− | :: - 4 TI boards were populated with 4 additional transceivers and can be used as master-TIs handling the clock and trigger distribution for up to 6 crates
| + | |
− | :: - One extra transceiver was added to 4 TI boards. They can be used as a master-TI for small sub-systems (like the microscope, SC, PS)
| + | |
− | : '''2. Final Detector installation'''
| + | |
− | :* Use the global trigger distribution (the global trigger and the trigger distribution crates)
| + | |
− | :: - Up to 4 sub-systems can run in parallel sharing the TS (TS partitioning).
| + | |
− | :: - Calibrate DAQ (readout windows, pedestals, thresholds, etc.) and trigger parameters (offsets, threshold, etc.)
| + | |
− | : '''3. Detector Calibration with the Beam'''
| + | |
− | | + | |
− | | + | |
− | | + | |
− | <span style="color:#800000;font-size:120%"> Phase I (Initial Installation) </span>
| + | |
− | | + | |
− | | + | |
− | '''BCAL'''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * Pulser for pedestals calibration
| + | |
− | : Can be generated by the master TI
| + | |
− | * Cosmic
| + | |
− | : Generated by CTP in each crate. Possibility to generate the trigger for each BCAL module.
| + | |
− | : ID of the 'fired' module is sent to the SSP along with the energy sum.
| + | |
− | : The trigger is sent from the SSP front pannel to the master TI.
| + | |
− | : Algorithm is being implemented.
| + | |
− | * LED Pulser
| + | |
− | : Initiated by 2 CAEN 1495 board (24 TTL outputs)
| + | |
− | : LED pattern programmed through EPICS
| + | |
− | : LVDS output is used as an external trigger for the master TI
| + | |
− | | + | |
− | | + | |
− | '''FCAL'''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * Pulser for pedestals calibration
| + | |
− | * Cosmic
| + | |
− | : Energy summed in the crates (CTP). Energy threshold set at SSP.
| + | |
− | : The trigger is sent from the SSP front pannel to the master TI.
| + | |
− | * LED Pulser
| + | |
− | : The same as for the BCAL
| + | |
− | | + | |
− | | + | |
− | ''' CDC '''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * External trigger from paddle scintillators
| + | |
− | : Use as input to the master TI
| + | |
− | | + | |
− | | + | |
− | '''FDC '''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * External trigger from the paddle scintillators
| + | |
− | : Use as input to the master TI
| + | |
− | | + | |
− | | + | |
− | '''TOF '''
| + | |
− | | + | |
− | One master TI to read out two crates
| + | |
− | * Pulser for pedestal calibration
| + | |
− | * Cosmic (?)
| + | |
− | | + | |
− | | + | |
− | '''SC '''
| + | |
− | * Pulser for pedestal calibration
| + | |
− | * Cosmic
| + | |
− | : Hit-bit trigger implemented on the CTP
| + | |
− | : Algorithm is being implemented.
| + | |
− | | + | |
− | | + | |
− | '''PS/PSC'''
| + | |
− | * Pulser for pedestal calibration and SiPMs calibration
| + | |
− | * Cosmic
| + | |
− | : Hit-bit trigger implemented on the CTP
| + | |
− | | + | |
− | | + | |
− | ''' Tagger Hodoscope '''
| + | |
− | | + | |
− | One master TI to read out two crates
| + | |
− | * Pulser for pedestal calibration
| + | |
− | * Cosmic
| + | |
− | : Hit-bit trigger implemented on the CTP
| + | |
− | | + | |
− | | + | |
− | ''' Microscope'''
| + | |
− | | + | |
− | One master TI to read out two crates
| + | |
− | * Pulser for pedestal calibration and SiPM calibration
| + | |
− | * Cosmic (?)
| + | |
− | : Hit-bit trigger implemented on the CTP
| + | |