− | *8:00 - 8:30 | + | *8:00 - 8:30 Executive Session |
− | *8:30 - 9:30 | + | *8:30 - 9:30 (40 + 20) Introduction and Project Overview |
** Meson spectroscopy introduction with focus on strange final states | ** Meson spectroscopy introduction with focus on strange final states | ||
** Kaon ID limitations with baseline GlueX and improvements with DIRC | ** Kaon ID limitations with baseline GlueX and improvements with DIRC | ||
Line 14: | Line 14: | ||
** Review of BaBar design and SLAC FDIRC prototype | ** Review of BaBar design and SLAC FDIRC prototype | ||
** General overview of design, referring to later talks for specifics | ** General overview of design, referring to later talks for specifics | ||
− | ** Summarize requirements for RICH MaPMT readout and show they're well matched to the DIRC | + | ** Summarize requirements for RICH MaPMT readout and show they're well matched to the DIRC (including DAQ/Trigger) |
** Evaluation of design based on John's simulation | ** Evaluation of design based on John's simulation | ||
− | *9:30 - 10: | + | *9:30 - 10:15 (30 + 15) Focusing Box Prototype Studies |
** Overview of prototype design | ** Overview of prototype design | ||
** John's test setup at Bates and mirror characterization | ** John's test setup at Bates and mirror characterization | ||
** Plans for full scale box design | ** Plans for full scale box design | ||
− | *10: | + | *10:15 - 10:45 Break |
− | *10: | + | *10:45 - 11:30 (30 + 15) Mechanical Design, Integration and Transport |
** Support structure design and integration with forward carriage | ** Support structure design and integration with forward carriage | ||
** Reasoning for horizontal (instead of vertical) design | ** Reasoning for horizontal (instead of vertical) design | ||
** Shipping crate design and tests with accelerometers at IU on mock bar box | ** Shipping crate design and tests with accelerometers at IU on mock bar box | ||
− | *11: | + | *11:30 - 12:30 (40 + 20) Project Management, Cost, and Schedule |
** Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc. | ** Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc. | ||
− | *12: | + | *12:30 - 1:30 Lunch (Executive Session) |
*1:30 - 4:00 Executive Session and Closeout | *1:30 - 4:00 Executive Session and Closeout | ||
Line 36: | Line 36: | ||
* September 23: Submit draft TDR to collaboration for review | * September 23: Submit draft TDR to collaboration for review | ||
* September 7: Receive feedback from internal committee's review of TDR | * September 7: Receive feedback from internal committee's review of TDR | ||
− | * August | + | * August 28: Submit draft TDR to internal committee for review |
* August 14: Complete drafts of all TDR sections | * August 14: Complete drafts of all TDR sections | ||
* Early July: First draft of all TDR sections | * Early July: First draft of all TDR sections |
Revision as of 07:15, 24 August 2015
Contents
Meeting Information
GlueX DIRC Review Meeting
October, 14 2015
Preliminary Agenda
- 8:00 - 8:30 Executive Session
- 8:30 - 9:30 (40 + 20) Introduction and Project Overview
- Meson spectroscopy introduction with focus on strange final states
- Kaon ID limitations with baseline GlueX and improvements with DIRC
- Overview of GlueX run plan
- Review of BaBar design and SLAC FDIRC prototype
- General overview of design, referring to later talks for specifics
- Summarize requirements for RICH MaPMT readout and show they're well matched to the DIRC (including DAQ/Trigger)
- Evaluation of design based on John's simulation
- 9:30 - 10:15 (30 + 15) Focusing Box Prototype Studies
- Overview of prototype design
- John's test setup at Bates and mirror characterization
- Plans for full scale box design
- 10:15 - 10:45 Break
- 10:45 - 11:30 (30 + 15) Mechanical Design, Integration and Transport
- Support structure design and integration with forward carriage
- Reasoning for horizontal (instead of vertical) design
- Shipping crate design and tests with accelerometers at IU on mock bar box
- 11:30 - 12:30 (40 + 20) Project Management, Cost, and Schedule
- Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc.
- 12:30 - 1:30 Lunch (Executive Session)
- 1:30 - 4:00 Executive Session and Closeout
TDR preparation schedule
- October 14: External review at JLab
- October 7: Dry runs of talks at JLab
- September 30: Submit final TDR to external committee
- September 23: Submit draft TDR to collaboration for review
- September 7: Receive feedback from internal committee's review of TDR
- August 28: Submit draft TDR to internal committee for review
- August 14: Complete drafts of all TDR sections
- Early July: First draft of all TDR sections
- Early June: Complete outline of TDR sections
Documents
- SVN repository for TDR
- Eventually will link to relevant document(s) on DocDB
- LHCb Paper on Multianode PMT arXiv.
- Talks for review in DocDB
- etc.