Difference between revisions of "2015-04-29"
From GlueXWiki
(→Detector Updates) |
(→Announcements) |
||
Line 19: | Line 19: | ||
* Accelerator Schedule Update | * Accelerator Schedule Update | ||
* [[GlueX-Collaboration-May-2015|May 2015 Collaboration Meeting]] | * [[GlueX-Collaboration-May-2015|May 2015 Collaboration Meeting]] | ||
+ | * Speaker request from PANDA: ``During the PANDA collaboration meeting of June, that will take place in Uppsala from 8 to 12 June 2015, we plan to have a workshop ( June 10-11) devoted to evaluate the status and the perspectives of the hadron physics sector.'' | ||
=== Run Planning for Spring 2015 === | === Run Planning for Spring 2015 === |
Revision as of 10:49, 29 April 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday April 29, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
- May 2015 Collaboration Meeting
- Speaker request from PANDA: ``During the PANDA collaboration meeting of June, that will take place in Uppsala from 8 to 12 June 2015, we plan to have a workshop ( June 10-11) devoted to evaluate the status and the perspectives of the hadron physics sector.
Run Planning for Spring 2015
Detector Updates
- Engineering Activities
- Target
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status April 27, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter April 28, 2015
- Tracking Joint FDC/CDC Meeting April 23, 2015
- Multi-track Events
- CDC
- FDC
- FADC FPGA FA125 update April 14, 2015
- Calorimeters: April 9, 2015
- FCAL pi-0 peak
- BCAL pi-0 peak
- BCAL Reconstruction March 19, 2015
- TOF April 7, 2015
- Online Systems April 8, 2015
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Activities April 1, 2015
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration April 8, 2015 - Calibration Dashboard
- Physics Analysis April 6, 2015
Other Activities
- PID Upgrades April 2, 2015 PID Upgrade
- Software (Level-3) September 2, 2014
- Technical Construction Report
- AOT