Difference between revisions of "GlueX Target Meeting, January 18, 2011"
From GlueXWiki
(add EVO link) |
m (Text replacement - "www/halldweb1/" to "www/halldweb/") |
||
(5 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
# Review [[GlueX Target Meeting, December 21, 2010#Minutes|minutes from previous meeting]]: all | # Review [[GlueX Target Meeting, December 21, 2010#Minutes|minutes from previous meeting]]: all | ||
# MOU Status: Mark | # MOU Status: Mark | ||
+ | #* [[Private:Issues with the UMass MOU|Issues with the UMass MOU]] | ||
=Communication= | =Communication= | ||
Line 26: | Line 27: | ||
==Slides== | ==Slides== | ||
− | Talks can be deposited in the directory <code>/group/halld/www/ | + | Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ . |
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Attendees: | ||
+ | * '''JLab''': Mark Ito (chair), Chris Keith, Yi Qiang, Elliott Wolin | ||
+ | * '''UMass''': Rory Miskimen | ||
+ | |||
+ | ==UMass MOU== | ||
+ | |||
+ | Mark reviewed [[Private:Issues with the UMass MOU|notes from a meeting]] last week on the construction MOU with UMass. Allison Lung suggested some significant changes. We are thinking about how to proceed. We will have to schedule a discussion (perhaps at the next collaboration meeting). | ||
+ | |||
+ | ==Target Refrigerator== | ||
+ | |||
+ | * Chris asked for some guidance about how soon we will want to purchase the refrigerator. | ||
+ | * He mentioned in passing that the unit being considered is water cooled and uses up to 11 kW. | ||
+ | * He got a copy of the flow diagram for the Hall B cryotarget. It looks a bit on the complicated side. | ||
+ | |||
+ | ==Next Meeting== | ||
+ | |||
+ | We will meet again in four weeks on Tuesday, February 15. |
Latest revision as of 06:10, 1 April 2015
Contents
Location, Time
Tuesday, January 18, 2011
1:30 pm EST
JLab: CEBAF Center, Room F326
Agenda
- Review minutes from previous meeting: all
- MOU Status: Mark
Communication
Videoconferencing
- ESNet: 8542553
- EVO: direct meeting link, phone bridge ID: 8 3487
Telephone
To connect by telephone:
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
Minutes
Attendees:
- JLab: Mark Ito (chair), Chris Keith, Yi Qiang, Elliott Wolin
- UMass: Rory Miskimen
UMass MOU
Mark reviewed notes from a meeting last week on the construction MOU with UMass. Allison Lung suggested some significant changes. We are thinking about how to proceed. We will have to schedule a discussion (perhaps at the next collaboration meeting).
Target Refrigerator
- Chris asked for some guidance about how soon we will want to purchase the refrigerator.
- He mentioned in passing that the unit being considered is water cooled and uses up to 11 kW.
- He got a copy of the flow diagram for the Hall B cryotarget. It looks a bit on the complicated side.
Next Meeting
We will meet again in four weeks on Tuesday, February 15.