Difference between revisions of "Coil Test Weekly Meeting 10-Jun-2011"
From GlueXWiki
m |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(9 intermediate revisions by one other user not shown) | |||
Line 9: | Line 9: | ||
'''Agenda''' | '''Agenda''' | ||
− | * Close out P6 solenoid task | + | * Close out P6 solenoid equipment task |
− | ** is everything ordered? | + | ** is everything ordered? additional PLC/Dataforth modules? PLC sequencing module? |
* Lessons learned from Coil 3 | * Lessons learned from Coil 3 | ||
** do we need to add or change anything? | ** do we need to add or change anything? | ||
Line 18: | Line 18: | ||
** cooldown timeline | ** cooldown timeline | ||
** subcoil inductances and quench detector | ** subcoil inductances and quench detector | ||
− | *** Floyd's spreadsheet lists for | + | *** Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H |
+ | *** in pairs you get 1.71 and 1.59, ratio about 1.08 | ||
+ | *** probably can get away with a single QD channel | ||
** Danfysik fault sequencer and slow dump | ** Danfysik fault sequencer and slow dump | ||
** additional PLC and HMI programming | ** additional PLC and HMI programming | ||
*** network loss problem? | *** network loss problem? | ||
+ | *** auto elog entries failed | ||
** fast DAQ | ** fast DAQ | ||
** replace smaller UPS | ** replace smaller UPS | ||
Line 33: | Line 36: | ||
* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS at JLab] | * [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS at JLab] | ||
** filled with BNL "training" data | ** filled with BNL "training" data | ||
− | |||
− | |||
* Preparing for moving into the hall | * Preparing for moving into the hall | ||
+ | ** permanent VME-based fast DAQ | ||
+ | * [http://halldweb.jlab.org/mantisbt Mantis Task Tracker] | ||
+ | ** role in Hall D Online/Controls effort |
Latest revision as of 10:26, 31 March 2015
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 10-Jun-2011 9:30 am ARC 231
Agenda
- Close out P6 solenoid equipment task
- is everything ordered? additional PLC/Dataforth modules? PLC sequencing module?
- Lessons learned from Coil 3
- do we need to add or change anything?
- Coil 2 status
- installation status
- hi-pot results
- cooldown timeline
- subcoil inductances and quench detector
- Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H
- in pairs you get 1.71 and 1.59, ratio about 1.08
- probably can get away with a single QD channel
- Danfysik fault sequencer and slow dump
- additional PLC and HMI programming
- network loss problem?
- auto elog entries failed
- fast DAQ
- replace smaller UPS
- anything else?
- Documentation
- trip chains
- anything else?
- Will there be any auxiliary tests?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- IRMIS at JLab
- filled with BNL "training" data
- Preparing for moving into the hall
- permanent VME-based fast DAQ
- Mantis Task Tracker
- role in Hall D Online/Controls effort