Difference between revisions of "Dec 18, 2014 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 20: | Line 20: | ||
= Action Items = | = Action Items = | ||
− | # Check into procedure for new MOUs (Elton) | + | # <strike> Check into procedure for new MOUs (Elton) </strike> Loan to UofR is being discontinued. Foreign MOUs are difficult to process, but domestic MOUs are moving forward |
− | # Provide initial calibration constants from cosmics for data base (Andrei) | + | # <strike> Provide initial calibration constants from cosmics for data base (Andrei) </strike> Andrei provided the table of gain constants and Mark has included them into CCDB. |
= References = | = References = | ||
Line 40: | Line 40: | ||
= Minutes = | = Minutes = | ||
− | ''Attendees: | + | ''Attendees: Elton, Adesh, Manuel, Will, Mark (JLab); Zisis, Andrei (UofR); Matt (IU) |
+ | |||
+ | # Announcements | ||
+ | #* Kudos to everyone for achievements for this year, especially getting to the point of producing pi0 peaks in both the FCAL and BCAL data! | ||
+ | # Action Items | ||
+ | # FCAL [https://logbooks.jlab.org/book/hdfcal HDFCAL log book] | ||
+ | ## Updates (Manuel and Adesh) | ||
+ | ##* Readout threshold has been increased for FCAL data from 105 to 108 to eliminate double peaking in the timing plots showed by Sergey yesterday | ||
+ | ##* Analysis of better pedestal analysis is underway | ||
+ | ##* Manuel will work on the HV GUIs over the break. They are considering the best way of implementing feedback. | ||
+ | ## FCAL VESDA system | ||
+ | ##* Tom and his crew are proceeding on preparations of the VESDA into the FCAL darkroom. No installation will occur till next year | ||
+ | ##* We need to communicate with Dave Kausch on the actual implementation as well as inputs of the fire alarm into the FCAL interlock system | ||
+ | ## Pulser electronics | ||
+ | # BCAL [https://logbooks.jlab.org/book/hdbcal HDBCAL log book] | ||
+ | ## Fixes during down time (TDC, humidity) | ||
+ | # Reconstruction and Simulation | ||
+ | # Calibration | ||
+ | # Any other business |
Revision as of 14:16, 18 December 2014
Contents
Video Conferencing Information
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Action Items
-
Check into procedure for new MOUs (Elton)Loan to UofR is being discontinued. Foreign MOUs are difficult to process, but domestic MOUs are moving forward -
Provide initial calibration constants from cosmics for data base (Andrei)Andrei provided the table of gain constants and Mark has included them into CCDB.
References
Tentative Agenda
- Announcements
- Action Items
- FCAL HDFCAL log book
- FCAL VESDA system
- Pulser electronics
- BCAL HDBCAL log book
- Fixes during down time (TDC, humidity)
- Reconstruction and Simulation
- Calibration
- Any other business
Minutes
Attendees: Elton, Adesh, Manuel, Will, Mark (JLab); Zisis, Andrei (UofR); Matt (IU)
- Announcements
- Kudos to everyone for achievements for this year, especially getting to the point of producing pi0 peaks in both the FCAL and BCAL data!
- Action Items
- FCAL HDFCAL log book
- Updates (Manuel and Adesh)
- Readout threshold has been increased for FCAL data from 105 to 108 to eliminate double peaking in the timing plots showed by Sergey yesterday
- Analysis of better pedestal analysis is underway
- Manuel will work on the HV GUIs over the break. They are considering the best way of implementing feedback.
- FCAL VESDA system
- Tom and his crew are proceeding on preparations of the VESDA into the FCAL darkroom. No installation will occur till next year
- We need to communicate with Dave Kausch on the actual implementation as well as inputs of the fire alarm into the FCAL interlock system
- Pulser electronics
- Updates (Manuel and Adesh)
- BCAL HDBCAL log book
- Fixes during down time (TDC, humidity)
- Reconstruction and Simulation
- Calibration
- Any other business