(Created page with "__TOC__ == Organization == * Time: 4:00 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web bro...") |
(→Minutes) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
** Need rates for profiler, start counter, ps | ** Need rates for profiler, start counter, ps | ||
* Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton) | * Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton) | ||
+ | * Screen of beam parameters for Hall D (Hovanes) | ||
+ | * Feedback on accelerator on latest ICD draft (Michael, Todd) | ||
== Agenda == | == Agenda == | ||
Line 26: | Line 28: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (CMU); Richard (UConn) |
+ | |||
+ | # Announcements | ||
+ | #* New accelerator schedule with likely close up of Hall D on Oct 10. | ||
+ | #* No meeting next week, just collaboration meeting. | ||
+ | # Action items | ||
+ | #* Note see below for update from Richard on simulations | ||
+ | #* Drawing. Tim says there will be an update by the end of the week | ||
+ | # Accelerator and Hall D Interface Document - update | ||
+ | # Update on Photon Commissioning (Alexandre) | ||
+ | #* Alexandre has added a diagram with the schedule. | ||
+ | #* Comments and feedback were made to the new diagram | ||
+ | #* The trigger commissioning plan from Sasha needs to be folded in with this schedule. | ||
+ | # [[Beam Simulations]] (Richard) | ||
+ | #* Submitted a job to simulate 1billion events to the OSG | ||
+ | #* No diamond radiator, replaced with 10 microns of Carbon | ||
+ | #* Boosted halo fraction to 1% (instead of 10^-5) | ||
+ | #* Made a box on the floor underneath the microscope to determine fluxes at the SiPMs | ||
+ | #* Added a matt 5x5m2 on the floor to determine fluxes | ||
+ | #* So far about 2/3 complete | ||
+ | #* Richard will report on this at the collaboration meeting | ||
+ | #* Richard also offered time on the OSG if Pavel would like to submit jobs using a build executable. Pavel may do this when it is ready | ||
+ | # RadCon update (Pavel) | ||
+ | #* Setup of archiving of averages in progress | ||
+ | #* Need a list of EPICS variables from Alexandre and Hovanes. | ||
+ | #* Additional shielding is needed around be beam pipe inside the labyrinth. This may not be necessary for this run, but will avoid work in that area after a beam period. Tim said that Pavel can close the loop with Keith and Neil can probably complete the needed work. | ||
+ | # Other business |
Latest revision as of 17:50, 24 September 2014
Organization
- Time: 4:00 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
- Screen of beam parameters for Hall D (Hovanes)
- Feedback on accelerator on latest ICD draft (Michael, Todd)
Agenda
- Announcements
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (CMU); Richard (UConn)
- Announcements
- New accelerator schedule with likely close up of Hall D on Oct 10.
- No meeting next week, just collaboration meeting.
- Action items
- Note see below for update from Richard on simulations
- Drawing. Tim says there will be an update by the end of the week
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Alexandre has added a diagram with the schedule.
- Comments and feedback were made to the new diagram
- The trigger commissioning plan from Sasha needs to be folded in with this schedule.
- Beam Simulations (Richard)
- Submitted a job to simulate 1billion events to the OSG
- No diamond radiator, replaced with 10 microns of Carbon
- Boosted halo fraction to 1% (instead of 10^-5)
- Made a box on the floor underneath the microscope to determine fluxes at the SiPMs
- Added a matt 5x5m2 on the floor to determine fluxes
- So far about 2/3 complete
- Richard will report on this at the collaboration meeting
- Richard also offered time on the OSG if Pavel would like to submit jobs using a build executable. Pavel may do this when it is ready
- RadCon update (Pavel)
- Setup of archiving of averages in progress
- Need a list of EPICS variables from Alexandre and Hovanes.
- Additional shielding is needed around be beam pipe inside the labyrinth. This may not be necessary for this run, but will avoid work in that area after a beam period. Tim said that Pavel can close the loop with Keith and Neil can probably complete the needed work.
- Other business