Difference between revisions of "Photon Beam Commissioning Discussion Aug 20, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 33: Line 33:
  
 
''Attending:
 
''Attending:
 +
 +
# Announcements
 +
# Recommendations from [http://www.jlab.org/Hall-D/halld_secure/reviews/ERR_HallD_Jul2014/Final_Report_HallD_Experiment_Readiness_Review.pdf ERR Report]
 +
# Aug 8 Photon Beam Commissioning Review [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/Final_Report/ReportonPhotonBeamCommissioning.pdf Final Report]
 +
# ARR presentations
 +
# Accelerator and Hall D Interface Document - needs to be finalized.
 +
# Update on Photon Commissioning (Alexandre)
 +
# [[Beam Simulations]]
 +
# RadCon update
 +
# Other business

Revision as of 08:43, 21 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on a drawing received from Tim, Richard will add field map from Dan Sober
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
  • Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline.
  • Alexandre will meet with RadCon next week to coordinate details of accessing monitor information

Agenda

  1. Announcements
  2. Recommendations from ERR Report
  3. Aug 8 Photon Beam Commissioning Review Final Report
  4. ARR presentations
  5. Accelerator and Hall D Interface Document - needs to be finalized.
  6. Update on Photon Commissioning (Alexandre)
  7. Beam Simulations
  8. RadCon update
  9. Other business

Minutes

Attending:

  1. Announcements
  2. Recommendations from ERR Report
  3. Aug 8 Photon Beam Commissioning Review Final Report
  4. ARR presentations
  5. Accelerator and Hall D Interface Document - needs to be finalized.
  6. Update on Photon Commissioning (Alexandre)
  7. Beam Simulations
  8. RadCon update
  9. Other business