Difference between revisions of "2007-12-12"
From GlueXWiki
Line 44: | Line 44: | ||
* Review the R&D reports due in 2008 | * Review the R&D reports due in 2008 | ||
− | + | ** BCAL: | |
− | ** BCAL: | + | |
Measure the light output for cosmic muons with the first | Measure the light output for cosmic muons with the first | ||
prototype SiPMT arrays and verify it is above 20 photo electrons. | prototype SiPMT arrays and verify it is above 20 photo electrons. | ||
Deadline for DOE: 30-Jun-08 | Deadline for DOE: 30-Jun-08 | ||
− | |||
** Tagger: | ** Tagger: | ||
Develop a fabrication technique to build a prototype of the tagger | Develop a fabrication technique to build a prototype of the tagger | ||
microscope and couple it to a SiPMT. | microscope and couple it to a SiPMT. | ||
Deadline for DOE: 30-Jun-08 | Deadline for DOE: 30-Jun-08 | ||
− | |||
** Electronics: | ** Electronics: | ||
Auxiliary electronics prototyping: Report summarizing the concept | Auxiliary electronics prototyping: Report summarizing the concept | ||
Line 60: | Line 57: | ||
be below 50ps | be below 50ps | ||
Deadline for DOE: 31-Aug-08 | Deadline for DOE: 31-Aug-08 | ||
− | + | ** FADC: | |
− | + | Complete fabrication and testing of prototype v1 of the | |
master trigger module and collect signals from 2 energy sum modules in | master trigger module and collect signals from 2 energy sum modules in | ||
parallel at 2.5 Gbits/sec | parallel at 2.5 Gbits/sec | ||
Deadline for DOE: 31-Aug-08 | Deadline for DOE: 31-Aug-08 | ||
− | |||
** FDC: | ** FDC: | ||
Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. | Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. | ||
Verify the wire placement is in +/- 50u. | Verify the wire placement is in +/- 50u. | ||
Deadline for DOE: 30-Sep-08 | Deadline for DOE: 30-Sep-08 | ||
− | |||
** UPV: | ** UPV: | ||
need a solution till end of February, which needs to be summarized in a CR to the project management. | need a solution till end of February, which needs to be summarized in a CR to the project management. |
Revision as of 22:56, 11 December 2007
Meeting Connections
To connect from the outside by phone please do the following
1.) ESNET: 8242553
2.) EVO: Room has been booked for GlueX Weekly meeting
3.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")
Agenda
- Announcements and Review Status
- IPR CD-3 22-24 July, 2008
- Collaboration Meeting in January
- Reports from Technical Groups
- Calorimetry
- Offline Software
- Tagger & Beamline
- Detector Updates
- Beamline & Tagger
- Solenoid
- Target
- Start Counter
- CDC CDC_12_12_2007
- FDC
- BCAL
- TOF
- FCAL
- Electronics
- Online
- Offline
- Monte Carlo
- Review the R&D reports due in 2008
- BCAL:
Measure the light output for cosmic muons with the first prototype SiPMT arrays and verify it is above 20 photo electrons. Deadline for DOE: 30-Jun-08
- Tagger:
Develop a fabrication technique to build a prototype of the tagger microscope and couple it to a SiPMT. Deadline for DOE: 30-Jun-08
- Electronics:
Auxiliary electronics prototyping: Report summarizing the concept and prototyping of the clock distribution. The jitter of the clock should be below 50ps Deadline for DOE: 31-Aug-08
- FADC:
Complete fabrication and testing of prototype v1 of the master trigger module and collect signals from 2 energy sum modules in parallel at 2.5 Gbits/sec Deadline for DOE: 31-Aug-08
- FDC:
Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. Verify the wire placement is in +/- 50u. Deadline for DOE: 30-Sep-08
- UPV:
need a solution till end of February, which needs to be summarized in a CR to the project management. The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
- Review of action items listed in action item tracker at http://www.jlab.org/~elke/ActionItemTrackerHallD.xls
- AOT