Difference between revisions of "BCAL Commissioning"
From GlueXWiki
(→Plans) |
|||
Line 1: | Line 1: | ||
− | == | + | == Upcoming Tasks == |
− | + | ||
+ | # Check fixes with LED pulser data on the south as well as the north side. | ||
+ | # Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates. | ||
+ | # Check ADV values of trigger scintillators to ensure their HV is set correctly. | ||
+ | # Take more cosmics runs when everything is working. | ||
+ | ## Check energy depositions in cells, starting with vertically oriented ones. | ||
+ | ## Check gains, including individual SiPMs into the sums. | ||
+ | # Develop scripts for analysis (students, Andrei) | ||
== Agenda/Minutes By Date == | == Agenda/Minutes By Date == | ||
* [[May 27, 2014 BCAL Commissioning]] | * [[May 27, 2014 BCAL Commissioning]] |
Revision as of 12:10, 28 May 2014
Upcoming Tasks
- Check fixes with LED pulser data on the south as well as the north side.
- Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates.
- Check ADV values of trigger scintillators to ensure their HV is set correctly.
- Take more cosmics runs when everything is working.
- Check energy depositions in cells, starting with vertically oriented ones.
- Check gains, including individual SiPMs into the sums.
- Develop scripts for analysis (students, Andrei)