Difference between revisions of "Level-1 Trigger"
(→Manuals) |
(→Manuals) |
||
Line 73: | Line 73: | ||
* [[ FADC 250 ]] | * [[ FADC 250 ]] | ||
− | |||
− | |||
− | |||
− | |||
* [https://halldweb1.jlab.org/level-1/manuals/TI TI manuals ] | * [https://halldweb1.jlab.org/level-1/manuals/TI TI manuals ] | ||
* [https://halldweb1.jlab.org/level-1/manuals/CTP CTP manuals ] | * [https://halldweb1.jlab.org/level-1/manuals/CTP CTP manuals ] | ||
+ | |||
+ | * [https://coda.jlab.org/wiki/index.php/Linux_Diskless_Setup Linux discless setup ] | ||
+ | |||
+ | * [https://clonwiki.jlab.org/wiki/index.php/GE_XVB601 GE XVB601 controller setup (Hall-B page) ] | ||
=== Useful Links === | === Useful Links === | ||
[[How To]] | [[How To]] |
Revision as of 11:30, 19 May 2014
Contents
Level 1 Trigger Goal
The main goal of the GlueX experiment is the search of exotic mesons produced in interactions of 8.4 - 9.0 GeV linearly polarized beam photons with a liquid hydrogen target. The beam photons are created by the 12 GeV electrons incident on a diamond crystal via bremsstrahlung process. The GlueX detector will start taking data at a luminosity corresponding to about 107 photons per second in the photon-beam energy range of 8.4 < Eγ < 9.0 GeV. The Level-1 trigger has to reduce the rate from electromagnetic and hadronic interactions seen by the GlueX detector to a level acceptable by a data acquisition for writing events directly to tape, about 20 kHz. Later, the luminosity will be increased by an order of magnitude to 108 photons per second. For high-luminosity runs, events accepted by the Level-1 trigger will be sent to the thirt level trigger at the rate which should not exceed 200 kHz. The Level-3 trigger will perform an event reconstruction on a PC farm allowing to further reduce low-energy photon interactions and providing an additional rate reduction of about factor of 10. At the same time, the Level-1 trigger has to accept all multi-particle exotic meson candidates produced in the beam energy range E > 8 GeV.
Hardware Algorithms
Monitoring
Hardware
Reviews and Meetings
- 12 GeV Trigger Workshop, CNU, July 2010
- 12 GeV Trigger Workshop, CNU, July 2009
- Subsystems Review, JLab, May 2008
Beam Tests
- Microscope Hall-B beam test, 2011
- FCAL Hall-B beam test, 2011
- BCAL beam test, 2012
- Pair Spectrometer Hall-B beam test, 2012