Line 19: | Line 19: | ||
== Production == | == Production == | ||
− | - On Wednesday (8/14) we moved the FDC from Blue Crab to EEl126 (see pictures attached). | + | - On Wednesday (8/14) we moved the FDC from Blue Crab to EEl126 (see pictures attached). We installed tires on the cart at 30psi that worked as a cushion. Dave: had problems with the truck this morning that delayed the moving; still thinks will finish by Friday. If not, some stuff can be left at Blue Crab close to the doors to be moved on Monday. Eugene suggested to move the two granite tables left at Blue Crab (one went to Brian Cross) to the ESB temporary and then try to occupy some of "our space" in the TEDF or Test Lab. Tom is providing help for the transportation. |
− | - | + | - End of last week we finished the cabling dry run: 1/4 of the signal cables were installed (see pictures attached). The additional rails for the mesh are causing some problems for the installation and operation of the chambers being very close to the pre-amps and connectors. Especially, due to the four additional rails on the sides the density of the cables between them is very high so that it is difficult to work on the pre-amps behind them. |
== Engineering == | == Engineering == |
Revision as of 12:36, 16 August 2013
August 15, 2013 FDC meeting
Agenda
- Production
- Engineering (Bill)
- Survey results
- Electronics (Chris, Nick)
- Tests at EEL126
- Other