- Dave: moving out is going smoothly so far. The big items: we will keep the stringing granite table somewhere in the ESB. One granite table will be loan to Brian Cross, we will have to find a user for the other. The mounting jig and the tooling for the package assembly will be kept in 126. We all agreed the FDC (on a 60x80" cart) will go to 126. Beni suggested putting it on the left side of the Hall D area next to the slow control racks. There we can test it with gas and HV and even install scintillators for triggering and get some data (Beni). We will need to remove one door and move one cabinet to make space at the entrance of 126. The plan is to move the FDC on Wednesday. | - Dave: moving out is going smoothly so far. The big items: we will keep the stringing granite table somewhere in the ESB. One granite table will be loan to Brian Cross, we will have to find a user for the other. The mounting jig and the tooling for the package assembly will be kept in 126. We all agreed the FDC (on a 60x80" cart) will go to 126. Beni suggested putting it on the left side of the Hall D area next to the slow control racks. There we can test it with gas and HV and even install scintillators for triggering and get some data (Beni). We will need to remove one door and move one cabinet to make space at the entrance of 126. The plan is to move the FDC on Wednesday. |
Revision as of 11:14, 16 August 2013
August 15, 2013 FDC meeting
Agenda
- Production
- Engineering (Bill)
- Survey results
- Electronics (Chris, Nick)
- Tests at EEL126
- Other