Difference between revisions of "2013-08-07"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 26: | Line 26: | ||
=== Announcements === | === Announcements === | ||
# Solenoid Status | # Solenoid Status | ||
+ | # Level-3 Trigger Working Group | ||
+ | # Trip to SLAC to discuss DIRC | ||
=== MOU and Contract Status === | === MOU and Contract Status === | ||
Line 41: | Line 43: | ||
* Tracking [[July 31, 2013 Tracking CDC/FDC| July 31, 2013]] | * Tracking [[July 31, 2013 Tracking CDC/FDC| July 31, 2013]] | ||
** CDC | ** CDC | ||
− | ** FDC | + | ** FDC [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0610.JPG], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0619.JPG] |
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, August 1, 2013|August 1, 2013]] | ** TOF [[GlueX TOF Meeting, August 1, 2013|August 1, 2013]] | ||
Line 52: | Line 54: | ||
** Installation [[August 2, 2013 Installation|August 2, 2013 Installation]] | ** Installation [[August 2, 2013 Installation|August 2, 2013 Installation]] | ||
* Electronics | * Electronics | ||
− | * | + | * Trigger |
− | * | + | ** Hardware (Level-1) [[OWG Meeting 17-Jul-2013 |July 17, 2013]] |
+ | ** Software (Level-3) | ||
* DAQ/Monitoring/Controls [[OWG Meeting 17-Jul-2013 |July 17, 2013]] | * DAQ/Monitoring/Controls [[OWG Meeting 17-Jul-2013 |July 17, 2013]] | ||
* Offline [[GlueX Offline Meeting, July 24, 2013|July 24, 2013]] | * Offline [[GlueX Offline Meeting, July 24, 2013|July 24, 2013]] | ||
* Photon Beam and Tagger [[BLTWG Meeting 08/05/2013|August 5, 2013]] | * Photon Beam and Tagger [[BLTWG Meeting 08/05/2013|August 5, 2013]] | ||
* Physics [[July 29, 2013, Physics Working Group|July 29, 2013]] | * Physics [[July 29, 2013, Physics Working Group|July 29, 2013]] |
Latest revision as of 07:39, 7 August 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday August 7, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Solenoid Status
- Level-3 Trigger Working Group
- Trip to SLAC to discuss DIRC
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Contracts
- UConn (Diamond)
Reports from Technical Groups
- Calorimeters:
- Calorimetry July 30, 2013
- BCAL Readout August 6, 2013
- Tracking July 31, 2013
- PID
- TOF August 1, 2013
- Start Counter July 25, 2013
- PID Upgrades July 25, 2013
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation August 2, 2013 Installation
- Electronics
- Trigger
- Hardware (Level-1) July 17, 2013
- Software (Level-3)
- DAQ/Monitoring/Controls July 17, 2013
- Offline July 24, 2013
- Photon Beam and Tagger August 5, 2013
- Physics July 29, 2013