Difference between revisions of "Minutes-6-20-2013"

From GlueXWiki
Jump to: navigation, search
(Full electronics tests)
Line 1: Line 1:
June 20, 2013 FDC meeting
+
June 27, 2013 FDC meeting
  
 
= Agenda =
 
= Agenda =
# Production [http://www.jlab.org/Hall-D/detector/fdc/clucou/IMG_0516.JPG spare package installed], [http://www.jlab.org/Hall-D/detector/fdc/clucou/IMG_0511.JPG and the people around it]
+
# Production [http://www.jlab.org/Hall-D/detector/fdc/clucou/IMG_0516.JPG spare package installed]
#* Spare package tests (Vlad)
+
#* Spacers between packages (Bill, Dave)
#* Thicker cell results (Lubomir)  [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek1.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek2.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00010.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00011.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00000.png],  [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00001.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00002.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00003.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00004.png], [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek00005.png]
+
#* Thicker cell results (Lubomir, Vlad)  [http://www.jlab.org/Hall-D/detector/fdc/clucou/tek.png]
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
Line 10: Line 10:
 
# Other
 
# Other
  
 +
<!--
  
 
= Minutes =
 
= Minutes =
Line 37: Line 38:
  
 
- Plans: the new VXS crate is in 126 and Chris and Nick will install it soon. Next week when Cody is back Beni will take 12 more fADC125s. Then we will connect the last two cells with signal cables and will be able to take data from all the channels.
 
- Plans: the new VXS crate is in 126 and Chris and Nick will install it soon. Next week when Cody is back Beni will take 12 more fADC125s. Then we will connect the last two cells with signal cables and will be able to take data from all the channels.
 +
 +
-->

Revision as of 12:24, 26 June 2013

June 27, 2013 FDC meeting

Agenda

  1. Production spare package installed
    • Spacers between packages (Bill, Dave)
    • Thicker cell results (Lubomir, Vlad) [1]
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Full electronics test FDC E-log (Beni)
  5. Other