− | ''Attending: | + | ''Attending: Chris, Tina, Elton, Jim, Nic |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | #* Length of tubing can be accommodated with RTV on the joint | ||
+ | #* New assemblies have the cables tucked in so should be ok to mount, but should still check. | ||
+ | # Light guides (Tina) | ||
+ | # SiPM production testing (Yi) | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Electronic boards and SiPM sorting (Fernando and Chris) |
Revision as of 12:06, 3 May 2013
Action Items from previous meetings
- Interface with Tom for optimum placement of tubing in cooling plate during gluing. Provide a cover plate to assist with alignment. (Chris and Nic)
- Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)\
- Check on status of returning "borrowed" SiPM (Elton)
Tentative Agenda
- Announcements
- Action Items
- Light guides (Tina)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)
Minutes
Attending: Chris, Tina, Elton, Jim, Nic
- Announcements
- Action Items
- Length of tubing can be accommodated with RTV on the joint
- New assemblies have the cables tucked in so should be ok to mount, but should still check.
- Light guides (Tina)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)