Difference between revisions of "May 2, 2013 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 15: Line 15:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Chris, Tina, Elton, Jim, Nic
 +
 
 +
# Announcements
 +
# Action Items
 +
#* Length of tubing can be accommodated with RTV on the joint
 +
#* New assemblies have the cables tucked in so should be ok to mount, but should still check.
 +
# Light guides (Tina)
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Electronic boards and SiPM sorting (Fernando and Chris)

Revision as of 12:06, 3 May 2013

Action Items from previous meetings

  1. Interface with Tom for optimum placement of tubing in cooling plate during gluing. Provide a cover plate to assist with alignment. (Chris and Nic)
  2. Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)\
  3. Check on status of returning "borrowed" SiPM (Elton)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Light guides (Tina)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Electronic boards and SiPM sorting (Fernando and Chris)

Minutes

Attending: Chris, Tina, Elton, Jim, Nic

  1. Announcements
  2. Action Items
    • Length of tubing can be accommodated with RTV on the joint
    • New assemblies have the cables tucked in so should be ok to mount, but should still check.
  3. Light guides (Tina)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Electronic boards and SiPM sorting (Fernando and Chris)